Call Number (LC) Title Results
D 103.53:M-312 Investigation of materials for waterproofing leaky corrugated galvanized steel-arch magazines from the inside / 1
D 103.53:M-313 Study of EMI/RFI seals on shielded-enclosure personnel access doors / 1
D 103.53:M-314 Evaluation of lightweight, relocatable structures for use in theaters of operations / 1
D 103.53:M-316 Arc-sprayed metals for structural electromagnetic shielding / 1
D 103.53:M-319 Flexible, water-resistant urethane coatings for ferrous surfaces on U.S. Army Corps of Engineers' dams / 1
D 103.53:M-320 Military installation painting problems : survey analysis and recommended solutions / 1
D 103.53:M-321 Coatings and cathodic protection of piling in seawater : results of 10-year exposure at LaCosta Island, FL / 1
D 103.53:M-323 Troop construction in the Middle East. 1
D 103.53:M-324 Summary of repair techniques for aluminum bridging / 1
D 103.53:M-326 Effects of high heat input welding of construction steels A36, A514, and A516 / 1
D 103.53:M-327 Preliminary analysis of the seismic vulnerability of selected buildings at Fort Ord, California, using the rapid seismic analysis procedure. 1
D 103.53:M-329 Protective coatings for aluminum torpedoes / 1
D 103.53:M-330 Advanced structural concepts for weapons storage : flat and mountainous terrains. 1
D 103.53:M-331 Stabilization of the solvent methyl-n-amyl ketone (MAK) in vinyl paints / 1
D 103.53:M-332 Electromagnetic shielding of full-sized structures by metal arc spraying / 1
D 103.53:M-333 Preliminary investigation of ceramic-coated anodes for cathodic protection / 1
D 103.53:M-334 Evaluation of contractor quality control of built-up roofing / 1
D 103.53:M-337 Development of concepts for corrosion assessment and evaluation of underground pipelines / 1
D 103.53:M-338/v.1-2 Munitions storage concepts for use in flat terrain. 1
D 103.53:M-342 Evaluation of commercial magnetic descalers / 1