D 103.53:M-91/08
|
|
|
D 103.53:M-91/16
|
|
|
D 103.53:M-91-18
|
|
|
D 103.53:M 91/19
|
Key issues in the application of existing conventional high speed railroad technologies to mobilization |
1 |
D 103.53:M-91/20
|
Use and upgrade of the USACERL Biaxial Shock Test Machine, workshop summary / |
1 |
D 103.53:M-91/37
|
Six-year summary of Fort Irwin, CA, family housing comparison test : operation and maintenance costs of manufactured vs. conventionally built units / |
1 |
D 103.53:M-94
|
Study of articulated concrete revetment mattress : test and analysis - results of fy 1974 program / |
1 |
D 103.53:M-118
|
Load-deflection behavior of lime-stabilized layers / |
1 |
D 103.53:M-126
|
Analysis of leaks in the high temperature hot water piping system at Fort Gordon, Ga. / |
1 |
D 103.53:M-175
|
Three-dimensional seismic structural analysis of Letterman Hospital / |
1 |
D 103.53:M-177
|
Operations guide--water and cement content of fresh concrete / |
1 |
D 103.53:M-180
|
An analytical model for uniaxial cyclic inelastic behavior of reinforced concrete / |
1 |
D 103.53:M-181
|
Initial studies of in-SEM fracture using a tensile stage / |
1 |
D 103.53:M-185
|
Investigation of automated evaluation of field weld radiographs / |
1 |
D 103.53:M-207
|
Coatings and cathodic protection of pilings in seawater : results of 5-year exposure / |
1 |
D 103.53:M-213
|
Guidelines for evaluating the seismic resistance of existing buildings / |
1 |
D 103.53:M-221
|
Evaluation of the corrosion resistance of alternate revetment wire fabric materials in the lower Mississippi River / |
1 |
D 103.53:M-230
|
Rapid construction for hardening above-ground facilities to small arms fire / |
1 |
D 103.53:M-231
|
Feasibility of structural foam/concrete building for theater of operations use / |
1 |
D 103.53:M-246
|
Schedule 40 polyvinyl chloride pipe for army theater of operations construction / |
1 |