D 103.6/3:1110-2-1607/965
|
Tidal hydraulics. |
1 |
D 103.6/3:1110-2-1802/967
|
Subsurface investigation : geophysical explorations. |
1 |
D 103.6/3:1110-2-1803/972
|
Subsurface investigations : soils. |
1 |
D 103.6/3:1110-2-1901/993
|
Seepage analysis and control for dams : engineering and design. |
1 |
D 103.6/3:1110-2-1902/970
|
Engineering and design stability of earth and rock-fill dams. |
1 |
D 103.6/3:1110-2-1903
|
Bearing capacity of soils. |
1 |
D 103.6/3:1110-2-1904
|
Soil mechanics design : settlement analysis / |
1 |
D 103.6/3:1110-2-1905
|
Design of finite relief well systems. |
1 |
D 103.6/3:1110-2-1906
|
Laboratory soils testing : engineering and design. |
1 |
D 103.6/3:1110-2-1906/968
|
Laboratory soils testing : engineering and design. |
1 |
D 103.6/3:1110-2-1906/970
|
Laboratory soils testing. |
1 |
D 103.6/3:1110-2-1906/986
|
Laboratory soils testing : engineering and design. |
1 |
D 103.6/3:1110-2-1907
|
Engineering and design : soil sampling. |
1 |
D 103.6/3:1110-2-1909
|
Engineering and design : calibration of laboratory soils testing equipment. |
1 |
D 103.6/3:1110-2-1913
|
Design and construction of levees : engineering and design. |
1 |
D 103.6/3:1110-2-1913/2000
|
Design and construction of levees : engineering and design. |
1 |
D 103.6/3:1110-2-2000/974
|
Standard practice for concrete / |
1 |
D 103.6/3:1110-2-2300/971
|
Earth and rock-fill dams : general design and construction considerations. |
1 |
D 103.6/3:1110-2-2400
|
Engineering and design : structural design of spillways and outlet works. |
1 |
D 103.6/3:1110-2-2501/962
|
Wall design : flood walls. |
1 |