E 1.99: doe/er/40150-1867
|
Design of the SNS Cavity Support Structure |
1 |
E 1.99: doe/er/40150-1868
|
Design of the CEBAF Energy Upgrade Cryomodule Cold Mass |
1 |
E 1.99: doe/er/40150-1869
|
Cryogenic Testing of the RF Input Waveguide for the CEBAF Upgrade Cryomodule |
1 |
E 1.99: doe/er/40150-1870
|
Design of the SNS Cryomodule |
1 |
E 1.99: doe/er/40150-1871
|
Control System Segmentation |
1 |
E 1.99: doe/er/40150-1872
|
The CEBAF Beam Scraping Monitor |
1 |
E 1.99: doe/er/40150-1873
|
Shipping and Alignment for the SNS Cryomodule |
1 |
E 1.99: doe/er/40150-1874
|
Online Measurement and Tuning of Multipass Recirculation Time in the CEBAF Linac |
1 |
E 1.99: doe/er/40150-1875
|
Empirically Determined Response Matrices for On-Line Orbit and Energy Correction at Jefferson Lab |
1 |
E 1.99: doe/er/40150-1876
|
High Average Current Effects in Energy Recovery Linacs |
1 |
E 1.99: doe/er/40150-1877
|
High Brightness Injectors Based On Photocathode DC Gun |
1 |
E 1.99: doe/er/40150-1878
|
Cumulative Beam Breakup in Linear Accelerators with Arbitrary Beam Current Profile |
1 |
E 1.99: doe/er/40150-1879
|
Superconducting Prototype Cavities for the Spallation Neutron Source (SNS) Project |
1 |
E 1.99: doe/er/40150-1880
|
Testing Procedures and Results of the Prototype Fundamental Power Coupler for the Spallation Neutron Source |
1 |
E 1.99: doe/er/40150-1881
|
Development and Testing of a Prototype Tuner for the CEBAF Upgrade Cryomodule |
1 |
E 1.99: doe/er/40150-1882
|
Processing Test Stand for the Fundamental Power Couplers of the Spallation Neutron Source (SNS) Superconducting Cavities |
1 |
E 1.99: doe/er/40150-1883
|
CEBAF Upgrade Cryomodule Component Testing in the Horizontal Test Bed (HTB) |
1 |
E 1.99: doe/er/40150-1884
|
Microphonics Testing of the CEBAF Upgrade 7-Cell Cavity |
1 |
E 1.99: doe/er/40150-1885
|
Electronic Damping of Microphonics in Superconducting Cavities |
1 |
E 1.99: doe/er/40150-1886
|
High Accuracy Beam Current Monitor of the CEBAF Hall A |
1 |