Call Number (LC) | Title | Results |
---|---|---|
E 1.99:estsc--000530ibmpc00 | TILT. Trip Information Log Tracking System | 1 |
E 1.99:ETC RPT:100546(U) | Feasibility of High Frequency Acoustic Imaging for Inspection of Containments Phase II. | 1 |
E 1.99:etde/oa--237 | ETDEWEB versus the World-Wide-Web a specific database/web comparison. | 1 |
E 1.99:etde/pub--2(rev.1) | International Energy Subject Thesaurus. Revision 1. | 1 |
E 1.99:ETDE/PUB--2(Rev.2) | International Energy Subject Thesaurus. Revision 2. | 1 |
E 1.99:etde/pub-3 | International energy Research organizations, 1986--1990. | 1 |
E 1.99:etde/pub--3(rev.1) | International energy Research organizations, 1988--1992. Revision 1. | 1 |
E 1.99:etec-82-11 | Bibliography injection technology applicable to geothermal utilization. | 1 |
E 1.99:etec--84-2 | CRBR prototype pump test program in SPTF. Final report | 1 |
E 1.99: etec-84-20 | Cascade a review of heat transport and plant design issues. | 1 |
E 1.99:etec-87-7 | Quality site seasonal report, Fort Devens Launderette, SFBP (Solar in Federal Buildings Program) 1751, December 1984 through June 1985 | 1 |
E 1.99:etec-87-8 | Quality site seasonal report, Tucson Job Corps Center, SFBP (Solar in Federal Buildings Program) 1751, November 1984 through July 1985 | 1 |
E 1.99:etec-87-13 | Quality site seasonal report, Eisenhower Museum, SFBP (Solar in Federal Buildings Program) 4008, March 1985 through September 1985 | 1 |
E 1.99: etec--89-7 | The Gevaltig An inertial fusion powered manned spacecraft design for outer solar system missions. | 1 |
E 1.99: etec--91-20070 |
Innovative Clean Coal Technology (ICCT) 180 MW demonstration of advanced tangentially-fired combustion techniques for the reduction of nitrogen oxide (NOₓ) emissions from coal-fired boilers. Phase 1, Baseline tests. Innovative Clean Coal Technology (ICCT) 180 MW demonstration of advanced tangentially-fired combustion techniques for the reduction of nitrogen oxide (NO sub x ) emissions from coal-fired boilers. |
2 |
E 1.99:ETEC--97000422 | Mitigation Action Plan Lease of Parcel ED-1 of the Oak Ridge Reservation by the East Tennessee Economic Council. | 1 |
E 1.99: etec-drf-1714 | Leak rate analysis of the Westinghouse Reactor Coolant Pump | 1 |
E 1.99:etec-tdr-78-17 | Snubber sensitivity study. Final report, FY 78 | 1 |
E 1.99:etec-tdr-78-19 | Study of safety relief valve operation under ATWS conditions. [PWR] | 1 |
E 1.99:etec-tdr-78-19(suppl.) | Study of safety relief valve operation under ATWS conditions. [Super critical flow] | 1 |