Call Number (LC) Title Results
E 1.99:whc-sd-w113-acdr--001 Advanced conceptual design report solid waste retrieval facility, phase I, project W-113 1
E 1.99:WHC-SD-W113-FDR--001-Vol.1 Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 1 Title II design report. 1
E 1.99:whc-sd-w113-fdr--001-vol.2 Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 2 Solid waste retrieval facilities -- Phase 1, detail design drawings. 1
E 1.99:WHC-SD-W113-FDR--001-Vol.3 Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3 Specifications. 1
E 1.99:WHC-SD-W113-FDR--001-Vol.4 Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 4 Project cost estimate. 1
E 1.99:WHC-SD-W113-FDR--001-Vol.5 Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 5 Design validation assessments and lists. 1
E 1.99:whc-sd-w113-sdrd--001 Supplemental design requirements document enhanced radioactive and mixed waste storage Phase 5, Project W-113. 1
E 1.99:whc-sd-w151-anal--001 Structural evaluation of thermocouple probes for 241-AZ-101 waste tank 1
E 1.99:whc-sd-w151-atp--001-rev.1 Project W-151 flexible receiver radiation detector system acceptance test plan. Revision 1 1
E 1.99:whc-sd-w151-cn--001 Radioisotope inventory of T101AZ thermocouple tree from riser 13D 1
E 1.99:WHC-SD-W151-CSA--001 Criticality safety of project W-151, 241-AZ-101 retrieval system process test 1
E 1.99:WHC-SD-W151-DA--004 W-151 mixer pump energy absorption cylinder analysis 1
E 1.99:WHC-SD-W151-ETP--001-Rev.1 Engineering task plan for the 241-AZ-101 waste tank color video camera system 1
E 1.99:WHC-SD-W151-FDC--001-Rev.3 Functional design criteria Tank 101-AZ waste retrieval system. Revision 3. 1
E 1.99:whc-sd-w151-qapp--001-rev.2 Project specific quality assurance plan, W-151, Tank 241-AZ-101 waste retrieval system. Revision 2 1
E 1.99:whc-sd-w151-ti--002 Dose rate analysis for Tank 101 AZ (Project W151) 1
E 1.99:WHC-SD-W151-UM--001 Flexible Receiver Radiation Detection System (FRRDS) Users Manual 1
E 1.99:WHC-SD-W151-WP--005 Project W-151 development work plan for Tank AZ-101 riser mapping tool and data acquisition system. 1
E 1.99:whc-sd-w178-cdr--001 Conceptual design report, 219-S secondary containment upgrade, Project W-178 1
E 1.99:WHC-SD-W178-PMP--001 Project management plan for Project W-178, 219-S secondary containment 1