E 1.99:anl/ne--15/28
|
Technologies for pre-screening IAEA swipe samples |
1 |
E 1.99:anl/ne--15/29
|
Test plan for formulation and evaluation of grouted waste forms with shine process wastes |
1 |
E 1.99:anl/ne--15/31
|
Plant-Scale Concentration Column Designs for SHINE Target Solution Utilizing AG 1 Anion Exchange Resin |
1 |
E 1.99:anl/ne--15/32
|
V&V Of CFD Modeling Of The Argonne Bubble Experiment FY15 Summary Report. |
1 |
E 1.99:anl/ne--15/36
|
Preliminary Analysis of the Transient Reactor Test Facility (TREAT) with PROTEUS |
1 |
E 1.99:anl/ne--15/38
|
FY-15 Progress Report on Cleanup of irradiated SHINE Target Solutions Containing 140g-U/L Uranyl Sulfate |
1 |
E 1.99:anl/ne--15/39
|
A Scoping Analysis Of The Impact Of SiC Cladding On Late-Phase Accident Progression Involving Core-Concrete Interaction |
1 |
E 1.99:anl/ne--15/40
|
Rate Theory Modeling and Simulations of Silicide Fuel at LWR Conditions |
1 |
E 1.99:anl/ne--15/41
|
Status Report on NEAMS System Analysis Module Development |
1 |
E 1.99:anl/ne--15/42
|
Full Core Multiphysics Simulation with Offline Mesh Deformation |
1 |
E 1.99:anl/ne--15/43
|
Specification of the Advanced Burner Test Reactor Multi-Physics Coupling Demonstration Problem |
1 |
E 1.99:anl/ne--15/44
|
Multi-Physics Demonstration Problem with the SHARP Reactor Simulation Toolkit |
1 |
E 1.99:anl/ne--15/46
|
Optimization of the Processing of Mo Disks |
1 |
E 1.99:anl/ne--16/1
|
SHARP Multiphysics Tutorials |
1 |
E 1.99:anl/ne--16/2
|
Towards a method of rapid extraction of strontium-90 from urine urine pretreatment and alkali metal removal. |
1 |
E 1.99:anl/ne--16/3
|
Development and Validation of Methodology to Model Flow in Ventilation Systems Commonly Found in Nuclear Facilities. Phase I |
1 |
E 1.99:anl/ne--16/4
|
Development and Validation of Methodology to Model Flow in Ventilation Systems Commonly Found in Nuclear Facilities - Phase II |
1 |
E 1.99:anl/ne-16/5
|
High Throughput Method of Extracting and Counting Strontium-90 in Urine |
1 |
E 1.99:anl-ne--16/6
|
SHARP User Manual |
1 |
E 1.99:anl/ne--16/7
|
Optimization of SHINE Process Design and Verification of Plant-Scale AG 1 Anion-Exchange Concentration Column and Titania Sorbent Pretreatment. |
1 |