E 1.99:anl-05/02 (summary)
|
Argonne National Laboratory summary site environmental report for calendar year 2004. |
1 |
E 1.99:anl-05/03
|
Laser glazing of rails - WBB/IWS tests (CNRC-Ottawa). |
1 |
E 1.99:anl-05/05
|
Preliminary assessment of existing experimental data for validation ofreactor physics codes and data for NGNP design and analysis. |
1 |
E 1.99:anl-05/06
|
Fabrication of small-orifice fuel injectors for diesel engines. |
1 |
E 1.99:anl-05/08
|
YUCCA Mountain project. |
1 |
E 1.99:anl-05/09
|
Transmission electron microscopy analysis of corroded metal waste forms. |
1 |
E 1.99:anl-05/10
|
Proc. of the workshop on pushing the limits of RF superconductivity. |
1 |
E 1.99:anl-05/17
|
Environmentally assisted cracking in light water reactors Annual Report, January-December 2003. |
1 |
E 1.99:anl-05/18
|
Conversion Analyses for the VR-1 Reactor, part I and II. |
1 |
E 1.99:anl-05/20
|
Third millenium ideal gas and condensed phase thermochemical database for combustion (with update from active thermochemical tables). |
1 |
E 1.99:anl-05/21
|
Diagnostic examination of Generation 2 lithium-ion cells and assessment ofperformance degradation mechanisms. |
1 |
E 1.99:anl-05/22
|
A high power beam-on-target test of liquid lithium target for RIA. |
1 |
E 1.99:anl-05/23
|
Criticality calculations for the VR-1 reactor with IRT-3M-HEU fuel and IRT-4MLEU fuel. |
1 |
E 1.99:anl-05/30
|
Configuration and technology implications of potential nuclear hydrogen system applications. |
1 |
E 1.99:anl-05/32
|
Effects of heat treatment and formulation on the phase composition and chemical durability of the EBR-ll ceramic waste form. |
1 |
E 1.99:anl-05/33
|
Interlaboratory study of the reproducibility of the single-pass flow-through test method measuring the dissolution rate of LRM glass at 70 {sup {degree}}C and pH 10. |
1 |
E 1.99:anl-05/42
|
Proceedings of the Workshop on Applications of a Very Cold Neutron Source |
1 |
E 1.99:anl-05/43
|
Testing to evaluate the suitability of waste forms developed for electrometallurgically treated spent sodium-bonded nuclear fuel for disposal in the Yucca Mountain reporsitory. |
1 |
E 1.99:anl-05/58
|
Transient analysis for the tajoura critical facility with IRT-2M HEU fuel and IRT-4M leu fuel ANL independent verification results. |
1 |
E 1.99:anl-05/60
|
FreedomCAR and vehicle technologies heavy vehicle program FY 2006. Benefits analysis methodology and results - final report. |
1 |