E 1.99:bnl--104035-2014-ir
|
Comparison of June and September Operation of SBE |
1 |
E 1.99:bnl--104036-2014-ir
|
Stopband Correction Studies Bunch Shape at Injection vs Starting Oscillator Settings. |
1 |
E 1.99:bnl--104037-2014-ir
|
Vertical Tune Measurements at Slow Extraction |
1 |
E 1.99:bnl--104038-2014-ir
|
Measurements of the Radius of the AGS Beam During FEB (1.4 sec pulse rate) |
1 |
E 1.99:bnl--104039-2014-ir
|
Measurement of Tune Conditions for HEBT Achromatic Bend |
1 |
E 1.99:bnl--104040-2014-ir
|
Using I-10 Vertical Bump Magnet to Investigate the Clearance of H-5 Kicker Magnet |
1 |
E 1.99:bnl--104041-2014-ir
|
SEB Spill Structure |
1 |
E 1.99:bnl--104042-2014-ir
|
Temperature Effects of RF Cavity Tuning |
1 |
E 1.99:bnl--104043-2014-ir
|
SEC Calibrations |
1 |
E 1.99:bnl--104044-2014-ir
|
Vacuum Stability Around G-20 Gas Jet |
1 |
E 1.99:bnl--104045-2014-ir
|
Effect of Interpulse Dwell and Peak Field History on Accelerated Beam Intensity |
1 |
E 1.99:bnl--104046-2014-ir
|
Temperature Effects on RF Cavity Tuning |
1 |
E 1.99:bnl--104047-2014-ir
|
Testing of the PIP Monitor |
1 |
E 1.99:bnl--104048-2014-ir
|
The Fast Injection Bump and Machine Tunes |
1 |
E 1.99:bnl--104049-2014-ir
|
Further Studies of the Fast Injection Bump |
1 |
E 1.99:bnl--104050-2014-ir
|
E-20 Catcher Position and Skew Studies |
1 |
E 1.99:bnl--104051-2014-ir
|
Polarized Proton Fast Quad Tests |
1 |
E 1.99:bnl--104052-2014-ir
|
E-20 Beam Catcher Position and Skew |
1 |
E 1.99:bnl--104053-2014-ir
|
Additional Position Studies on the Beam Catcher at E-20 |
1 |
E 1.99:bnl--104054-2014-ir
|
Further Studies of the Fast Injection Bump and Comparison with Analytic Expressions and with Results from the BEAM Program |
1 |