E 1.99:bnl--69006
|
COMPARISON BETWEEN THE PREDICTIONS AND MEASUREMENTS FOR THE BEAM GAS INTERACTIONS DURING THE LAST GOLD AND PROTON RUNS IN RHIC. |
1 |
E 1.99:bnl--69007
|
FIXED FIELD ALTERNATING GRADIENT LATTICE DESIGN WITHOUT OPPOSITE BEND. |
1 |
E 1.99:bnl--69008
|
COMMISSIONING OF RHIC AT 100 GEV / NUCLEON. |
1 |
E 1.99:bnl--69009
|
IMPROVEMENTS OF THE RHIC RAMP EFFICIENCY. |
1 |
E 1.99:bnl--69024
|
A LARGE APERTURE NARROW QUADROUPOLE FOR THE SNS ACCUMULATOR RING. |
1 |
E 1.99:bnl--69025
|
COLLIMATOR DESIGN FOR THE HEBT LINE OF THE SNS PROJECT. |
1 |
E 1.99:bnl--69030
|
CALORIMETRY FOR GLOBAL MEASUREMENTS IN PHENIX. |
1 |
E 1.99:bnl--69035
|
PHOTON-HADRON INTERACTIONS AT RHIC AND LHC ENERGIES. |
1 |
E 1.99:bnl--69042
|
ABORT GAP CLEANING IN RHIC. |
1 |
E 1.99:bnl--69044
|
CONCEPTUAL DESIGN OF PION CAPTURE MAGNETS OF UP TO 15 CM BORE AND 20 T PEAK FIELD. |
1 |
E 1.99:bnl--69047
|
THE COLOUR GLASS CONDENSATE AN INTRODUCTION. |
1 |
E 1.99:bnl--69049
|
IMPACT OF DUCT LEAKAGE PRESSURES ON THE SHAPE OF THE DELTA Q CURVE. |
1 |
E 1.99:bnl--69052
|
KAON PHYSICS AT BNL. |
1 |
E 1.99:bnl--69054
|
HIGH POWER FAST KICKER SYSTEM FOR SNS BEAM EXTRACTION. |
1 |
E 1.99:bnl--69055
|
ASSESSMENT OF A PARTICLE BED BASED BEAM STOP. |
1 |
E 1.99:bnl--69056
|
ATTO SECOND ELECTRON BEAMS GENERATION AND CHARACTERIZATION EXPERIMENT AT THE ACCELERATOR TEST FACILITY. |
1 |
E 1.99:bnl--69061
|
ON THE THEORY OF COLLISIONS BETWEEN ATOMS AND ELECTRICALLY CHARGED PARTICLES. |
1 |
E 1.99:bnl--69063
|
METALLIZATION OF CERAMIC VACUUM CHAMBERS FOR SNS RING INJECTION KICKER MAGNETS. |
1 |
E 1.99:bnl--69065
|
NEUTRON IMAGING, RADIOGRAPHY AND TOMOGRAPHY. |
1 |
E 1.99:bnl--69066
|
EXECUTIVE SUMMARY OF THE SNOWMASS 2001 WORKING GROUP ELECTROWEAK SYMMETRY BREAKING. |
1 |