E 1.99:bnwl--817
|
AN IN SITU WELD DEFECT DETECTOR ACOUSTIC EMISSION. |
1 |
E 1.99:bnwl--818
|
METHODS OF MEASURING MECHANICAL DISPLACEMENT AND VIBRATION WITH EMPHASIS ON FFTF PRIMARY PIPING AND VESSEL. |
1 |
E 1.99:bnwl--819
|
CALCULATIONS OF VACANCY CLUSTER PRODUCTION IN IRON FOR EBR-II, DFR, FTR, AND ETR. |
1 |
E 1.99:bnwl--820
|
STATUS OF TECHNOLOGY IN THE UNITED STATES FOR SOLIDIFICATION OF HIGHLY RADIOACTIVE LIQUID WASTES. |
1 |
E 1.99:bnwl--821
|
FAST FLUX TEST FACILITY CHEMICAL ANALYSIS LABORATORY PRELIMINARY DESIGN STUDY. |
1 |
E 1.99:bnwl--822
|
CAPCOST A PROGRAM TO CALCULATE ESCALATED NUCLEAR POWER PLANT CAPITAL COSTS. |
1 |
E 1.99:bnwl--823
|
DESIGN SAFETY CRITERIA FOR THE FAST FLUX TEST FACILITY. |
1 |
E 1.99:bnwl--824
|
RESEARCH AND DEVELOPMENT ACTIVITIES FIXATION OF RADIOACTIVE RESIDUES. Quarterly Progress Report, February--April 1968. |
1 |
E 1.99:bnwl--825
|
ZIRCONIUM ELECTROPLATING ON URANIUM FROM MOLTEN ALKALI FLUORIDE SALTS. |
1 |
E 1.99:bnwl--826
|
ELECTRIC GROUNDING STUDY FOR FFTF. |
1 |
E 1.99:bnwl--829
|
REMOVAL OF ¹³⁷Cs FROM ALKALINE CONDENSATE WASTES. |
1 |
E 1.99:bnwl--831
|
2DB USER'S MANUAL. |
1 |
E 1.99:bnwl--831(rev.1)
|
2DB USER'S MANUAL. Revision 1. |
1 |
E 1.99:bnwl--832
|
WASTE SOLIDIFICATION PROGRAM. VOLUME III. DESIGN FEATURES OF THE FACILITIES AND EQUIPMENT FOR THE WSEP PRODUCT EVALUATION PROGRAM. |
1 |
E 1.99:bnwl-833
|
FUEL CYCLE COSTS FOR HEAVY WATER REACTORS. |
1 |
E 1.99:bnwl--834
|
TUBULAR FUEL ELEMENT WITH INTEGRAL TARGET PCTR EXPERIMENT. |
1 |
E 1.99:bnwl--835
|
RADIOLOGICAL STATUS OF THE GROUND WATER BENEATH THE HANFORD PROJECT, JULY-- DECEMBER 1967. |
1 |
E 1.99:bnwl--838
|
A STATE-OF-THE-ART SURVEY OF LOW-LEVEL MULTIPLEXERS. |
1 |
E 1.99:bnwl--841
|
EXPERIMENT DESCRIPTION AND HAZARDS EVALUATION FOR THE PACIFIC NORTHWEST LABORATORY MIXED OXIDE (UO₂--PuO₂) CAPSULES FOR INSERTION IN SUBASSEMBLY X011. |
1 |
E 1.99:bnwl--843
|
FORMATION OF UO₂--CARBON MIXTURES AND CARBIDE OR NITRIDE FUEL MATERIAL IN A SPRAY REACTOR. |
1 |