Call Number (LC) Title Results
E 1.99:coo-2472-3 Study of mathematical models of mutation and selection in multi-locus systems. Annual progress report, December 1, 1976--November 30, 1977 1
E 1.99:coo-2472-05 Study of mathematical models of mutation and selection in multi-locus systems. Annual progress report, December 1, 1977--November 30, 1978 1
E 1.99: coo-2472-07 Study of mathematical models of mutation and selection in multi-locus systems. Annual progress report, October 1, 1980-September 30, 1981 1
E 1.99:coo--2472-t1 A Study of Mathematical Models of Mutation and Selection in Multi-locus Systems 1
E 1.99:coo-2477-1 Cost comparison of very high temperature nuclear reactors for process heat applications 1
E 1.99:coo--2477-2 rev 1 Engineering Evaluation of Process Heat Applications for Very High Temperature Nuclear Reactors 1
E 1.99:coo-2477-4(vol.1) Licensing assessment of the CANDU pressurized heavy water reactor. Volume I. Preliminary safety information document 1
E 1.99:coo-2477-4(vol.2) Licensing assessment of the Candu Pressurized Heavy Water Reactor. Preliminary safety information document. Volume II. [USA] 1
E 1.99:coo-2477-5(vol.1) Capital Cost Pressurized Water Reactor Plant Volume 1. 1
E 1.99:coo--2477-5 vol 2 Capital Cost Pressurized Water Reactor Plant Volume 2. 1
E 1.99:coo-2477-6(vol.1) Capital cost Boiling Water Reactor Plant. Commercial electric power cost studies. 1
E 1.99:coo--2477-6 vol 2 Capital Cost Boiling Water Reactor Plant Volume 2. 1
E 1.99:coo-2477-7(vol.1) Capital cost high and low sulfur coal plants-1200 MWe. [High sulfur coal] 1
E 1.99:coo-2477-7(vol.3) Capital cost high and low sulfur coal plants-1200 MWe. [For low sulfur coal] 1
E 1.99:coo-2477-8(vol.1) Capital cost low- and high-sulfur coal plants, 800 MWe. 1
E 1.99:coo-2477-8(vol.2) Capital cost low and high sulfur coal plants; 800 MWe. 1
E 1.99:coo-2477-8(vol.3) Capital cost low and high sulfur coal plants; 800 MWe. 1
E 1.99:coo-2477-13(vol.1) Commercial electric power cost studies. Capital cost, Pressurized Heavy Water Reactor Plant 1
E 1.99:coo-2477-13(vol.2) Commercial electric power cost studies. Capital cost, Pressurized Heavy Water Reactor Plant 1
E 1.99:coo-2477-015 Preliminary study of large cogeneration/district heating power plants 1