E 1.99:coo-4206-10
|
Security assessment of power systems including energy storage and with the integration of wind energy. Progress report, July 1-September 30, 1979 |
1 |
E 1.99:coo-4207-12
|
Pilot demonstration-enhanced oil recovery by micellar-polymer waterflooding Bell Creek Field. Monthly technical progress report, June 1977 |
1 |
E 1.99:coo-4207-14
|
Pilot demonstration-enhanced oil recovery by micellar-polymer waterflooding Bell Creek Field. Monthly technical progress report, August 1977 |
1 |
E 1.99:coo-4207-16
|
Pilot demonstration enhanced oil recovery by micellar-polymer waterflooding, Bell Creek field. Monthly technical progress report for October 1977. |
1 |
E 1.99:coo-4208-1
|
Commercial scale demonstration, enhanced oil recovery by micellar-polymer flooding. Initial report, October--December 1976 |
1 |
E 1.99:coo/4210-1(summ.)
|
Grid-Connected Integrated Community Energy System. Executive Summary. Final report. Phase I, February 1, 1977--May 31, 1977. [Univ. of Minnesota Program] |
1 |
E 1.99:coo-4210-1(vol.2)
|
Grid Connected Integrated Community Energy System. Volume 2. Conventional Community Systems. Final report Phase I, February 1, 1977-May 31, 1977. |
1 |
E 1.99:coo-4210-2/2
|
Grid-connected integrated community energy system. Phase II, Stage 1, final report. Conceptual design, demand and fuel projections and cost analysis |
1 |
E 1.99:coo-4210-2/3
|
Grid-connected integrated community energy system. Phase II, Stage 1, final report. Conceptual design pyrolysis and waste management systems. |
1 |
E 1.99:coo-4210-3/1
|
Grid-connected integrated community energy system. Phase II, Stage 2, final report. Executive summary |
1 |
E 1.99:coo-4210-3/2
|
Grid connected integrated community energy system. Phase II final stage 2 report. Finance plan, capital costs and institutional analysis. |
1 |
E 1.99:coo-4210-3/3
|
Grid connected integrated community energy system. Phase II final state 2 report. Cost benefit analysis, operating costs and computer simulation. |
1 |
E 1.99:coo-4210-3/4
|
Grid connected integrated community energy system. Phase II final stage 2 report. Preliminary design of cogeneration plant. |
1 |
E 1.99:coo-4210-3/5
|
Grid connected integrated community energy system. Phase II final stage 2 report. Outline specifications of cogeneration plant. |
1 |
E 1.99:coo-4210-3/6
|
Grid connected integrated community energy system. Phase II final stage 2 report. Outline specifications of cogeneration plant; continued. |
1 |
E 1.99:coo-4210-3/7
|
Grid connected integrated community energy system. Phase II final state 2 report. Preliminary design waste management and institutional analysis. |
1 |
E 1.99:coo-4210-3/8
|
Grid-connected integrated community energy system. Phase II, Stage 2, final report. Preliminary design pyrolysis facility. [Andco-Torrax system] |
1 |
E 1.99:coo-4211-1/1
|
Preliminary feasibility study of a grid-connected integrated community energy system at Clark University. Volume I. Executive summary |
1 |
E 1.99:coo-4211-1/2
|
Preliminary feasibility study of a grid-connected Integrated Community Energy System at Clark University. Volume II. Report and appendices |
1 |
E 1.99:coo-4211-2
|
Grid-connected Integrated Community Energy System. Preliminary report, Phase II, August 9--November 8, 1977. [Clark Univ. , Worcester] |
1 |