Call Number (LC) Title Results
E 1.99:coo-5085-4 Energy analysis of geothermal-electric systems 1
E 1.99:coo-5092/3 Study of integration issues to realize OTEC market potential. First quarterly report. [134 references] 1
E 1.99:coo-5092-t1 Study of integration issues to realize OTEC market potential. Third quarterly report 1
E 1.99:coo-5098-(mit-nrl-003) Alloy development for irradiation performance in fusion reactors. Annual report, September 1978-September 1979 1
E 1.99:coo-5099-4 Fuel gas production from animal and agricultural residues and biomass. Quarterly coordination meeting, December 11-12, 1978, Denver, Colorado. Second Quarterly progress report 1
E 1.99:coo-5099-8 Fuel gas production from animal and agricultural residues and biomass. Quarterly coordination meeting, March 15-16, 1979, Tampa, Florida. Third quarterly progress report 1
E 1.99:coo-5100-3 Gamma-ray energy response of /sup 7/LiF and CaF/sub 2/ Mn TLDs. Annual report. 1
E 1.99:coo-5107-1 Predicted costs of environmental controls for a commercial oil shale industry. Volume 1. An engineering analysis 1
E 1.99:coo-5107-2 Predicted costs of environmental controls for a commercial oil shale industry. Volume II. A subjective self-assessment of uncertainty in the predicted costs 1
E 1.99:coo-5125-1 Studies of rf tandem mirror heating. Annual progress report, October 1, 1978-September 30, 1979 1
E 1.99:coo-5125-2 Investigation of barrier cell and auxilliary heating in a tandem mirror. Annual progress report, October 1, 1979-September 30, 1980 1
E 1.99:coo-5141-1 Improvement of yields and rates during enzymatic hydrolysis of cellulose to glucose. Progress report, December 1, 1978-February 28, 1979 1
E 1.99:coo-5141-2 Improvement of yields and rates during enzymatic hydrolysis of cellulose to glucose. Progress report, March 1, 1979-May 31, 1979 1
E 1.99:coo-5141-3 Improvement of yields and rates during enzymatic hydrolysis of cellulose to glucose. Progress report, June 1-August 31, 1979 1
E 1.99:coo--5152-15 Two phase pressure drop across abrupt area changes 1
E 1.99: coo-5709-1-vol.1-suppl Supplement to the Phase IV final report and fourth update of the Energy Economic Data Base (EEDB) Program 1
E 1.99: coo-5911-4 Design study for a high-current, steady-state autoresonant accelerator. Final report, July 14-November 14, 1979 1
E 1.99: coo-5911-5 Design study for a high-current, steady-state auto-resonant accelerator. Addendum to final report, July 14, 1979-November 14, 1979 1
E 1.99: coo-6411-1-vol.1 Fourth update of the Energy Economic Data Base (EEDB) Program. Phase IV, Final report. Volume I 1
E 1.99:coo-10041-1 Coral growth rings and the temporal history of nuclear /sup 14/C/C and /sup 90/Sr/Sr in the surface ocean. Progress report, February 1, 1979-January 31, 1980 1