Call Number (LC) Title Results
E 1.99:doe/bp-01830-10 Velocity Measurements at Three Fish Screening Facilities in the Yakima Basin, Washington Summer 1989 Annual Report. 1
E 1.99:doe/bp--01830-11 Regional Assessment of Supplementation Project. Status report 1
E 1.99:doe/bp-01830-11 Regional Assessment of Supplementation Project Status Report. 1
E 1.99:doe/bp-01830-14 Supplementation in the Columbia Basin Summary Report Series. 1
E 1.99:doe/bp/01830-t1 A fisheries evaluation of the Wapato, Sunnyside, and Toppenish Creek canal fish screening facilities, spring 1988 1
E 1.99:doe/bp--1832 Research projects in residential technology 1
E 1.99:doe/bp-1832 Research Projects in Residential Technology, 1992 Edition. 1
E 1.99:doe/bp-1843 Puget Sound Area Electric Reliability Plan Final Environmental Impact Statement. 1
E 1.99:doe/bp-1844 Puget Sound Area Electric Reliability Plan Appendix E, Transmission Reinforcement Analysis. 1
E 1.99:doe/bp-1845 Puget Sound Area Electric Reliability Plan Supplemental Environmental Analysis, Schultz Substation. 1
E 1.99:doe/bp-1863 Ross Hazardous and Toxic Materials Handling Facility Environmental Assessment. 1
E 1.99:doe/bp-1868 Draft 1992 Operations, Maintenance, and Replacement 10-Year Plan. 2
E 1.99:doe/bp-01873-1 Annual Coded Wire Tag Program; Washington Missing Production Groups, 1993 Annual Report. 1
E 1.99:doe/bp-01873-2 Annual Coded Wire Tag Program; Washington Missing Production Groups, 1994 Annual Report. 1
E 1.99:DOE/BP-01873-3 Annual Coded Wire Tag Program; Washington Missing Production Groups, 1995 Annual Report. 1
E 1.99:DOE/BP-01873-4 Annual Coded Wire Tag Program; Washington Missing Production Groups, 1996 Annual Report. 1
E 1.99:DOE/BP-01873-5 Annual Coded Wire Tag Program; Washington Missing Production Groups, 1998 Annual Report. 1
E 1.99:DOE/BP-01873-6 Annual Coded Wire Tag Program; Washington Missing Production Groups, 1997 Annual Report. 1
E 1.99:doe/bp-1874 1992 Resource Program, 10 Year Plan Draft II. 2
E 1.99:doe/bp-1880 Charting a Course for the Future BPA Programs in Perspectives, Technical Appendix.
Charting a course for the future Technical appendix.
2