E 1.99:doe/cs/34163-t1
|
Image collapsing concentrators. Final technical report, 1 October 1977-1 October 1980 |
1 |
E 1.99:doe/cs/34196-t1
|
Dual curvature acoustically damped concentrating collector. Final technical report |
1 |
E 1.99:doe/cs/34218-t1
|
SPS energy conversion and power management workshop. Final report |
1 |
E 1.99:doe/cs/34223-01
|
Training Community College faculty in the techniques and skills required for Solar Energy System installation |
1 |
E 1.99:doe/cs/34223-t1
|
Design, construction and testing of a liquid-heating flat-plate solar collector |
1 |
E 1.99:doe/cs/34267--1
|
Photovoltaic concentrator application experiment, Phase I a 150 KW photovoltaic concentrator power system for load-center applications with feedback into the utility grid. Final report, June 1, 1978--March 31, 1979. |
1 |
E 1.99:doe/cs/34281--01
|
Recommended requirements to code officials for solar heating, cooling, and hot water systems. Model document for code officials on solar heating and cooling of buildings |
1 |
E 1.99:doe/cs/34287--t1
|
Solar-selective paint coating development. Final report |
1 |
E 1.99:doe/cs/34293--t1
|
Berry Group R and D Project. SAS-1 development of selective surfaces. Technical progress report No. 3, June 2, 1980. |
1 |
E 1.99:doe/cs/34299--t1
|
Selective IR reflective coatings development. Final report, 24 July 1978-24 October 1979 |
1 |
E 1.99:doe/cs/34412--16
|
Solar hot water space heating system. Technical progress report |
1 |
E 1.99:doe/cs/34479--3
|
Numerical and experimental studies of liquid storage tank thermal stratification for a solar energy system |
1 |
E 1.99:doe/cs/34482--1
|
Developing and upgrading of solar system thermal energy storage simulation models. Technical progress report, September 1, 1977-February 28, 1978 |
1 |
E 1.99:doe/cs/34482--2
|
Developing and upgrading of solar system thermal energy storage simulation models. Technical progress report, March 1, 1978-August 31, 1978 |
1 |
E 1.99:doe/cs/34482--4
|
Developing and upgrading of solar system thermal energy storage simulation models. Technical progress report, March 1, 1979-February 29, 1980 |
1 |
E 1.99:doe/cs/34495--t1
|
Solar-MEC Development Program. Project 61019 annual report, September 1, 1977-September 30, 1978 |
1 |
E 1.99:doe/cs/34510--t1
|
Design, development and testing of a solar-powered multi-family residential size prototype turbocompressor heat pump |
1 |
E 1.99:doe/cs/34513--1
|
MIT Solar Building 5 the second year's performance. |
1 |
E 1.99:doe/cs/34537--t1
|
Design of a novel solar air conditioner using a solid-phase absorber. Phase 1. Draft final report, September 20, 1977-September 30, 1978 |
1 |
E 1.99:doe/cs/34696-1
|
Development of a gas backup heater for solar domestic hot-water systems. Final report, April 1978-April 1980 |
1 |