Call Number (LC) Title Results
E 1.99:doe/et/15614-17 MHD generator component development. Quarterly report, July 1983-September 1983 1
E 1.99:doe/et/15614-t1 MHD-generator-component development. Quarterly report, July 1980-September 1980 1
E 1.99:doe/et/16056-t1 Evaluating the status of the Texaco gasifier 1
E 1.99:doe/et/17005-1 Applications of composite gas turbine components. Phase I. Semi-annual technical progress report. [Composite or hybrid design with different facts of the component bonded together] 1
E 1.99:doe/et/17019-1 Development of molten carbonate fuel cell power plant. Quarterly technical progress report, February 1-April 30, 1980 1
E 1.99:doe/et/17019-2 Development of molten carbonate fuel cell power plant. Quarterly technical progress report, May 1-July 31, 1980 1
E 1.99:doe/et/17019-9 Development of molten carbonate fuel cell power plant. Quarterly progress report, February 1, 1982-April 30, 1982 1
E 1.99:doe/et/17089-5 High-temperature, solid oxide electrolyte fuel cell power generating system. Annual report, June 1, 1980-May 31, 1981 1
E 1.99:doe/et/17091-t1 Electrocyclone development program. Quarterly technical report, November 1980-January 1981 1
E 1.99:doe/et/17091-t4 Electrocyclone development program. Quarterly technical report, August-October 1981 1
E 1.99:doe/et/17093-1181 Testing and verification of granular-bed filters for the removal of particulate and alkalies. Fifth quarterly project report, October 1-December 31, 1981 1
E 1.99:doe/et/17093-1471 Testing and verification of granular-bed filters for the removal of particulate and alkalis. Tenth quarterly project report, January 1-March 31, 1983 1
E 1.99:doe/et/17093-1478 Testing and verification of granular-bed filters for the removal of particulate and alkalis. Eleventh quarterly project report, April 1, 1983-June 30, 1983 1
E 1.99:doe/et/20002-t1 Sugarcane spacing. II. Effects of spacing on the plant 1
E 1.99:doe/et/20006-4 Increasing the biomass production of short rotation coppice forestry. Quarterly progress report, January 1-March 31, 1980 1
E 1.99:doe/et/20006-t1 Increasing the biomass production of short rotation coppice forests. Progress report 1
E 1.99:doe/et/20023-1 Environmentally acceptable disposal of coal conversion solid waste residuals. Progress report, April 21-July 31, 1979 1
E 1.99:doe/et/20023-2 Experimental evaluation of coal conversion solid waste residuals. Progress report, August 1-October 31, 1979 1
E 1.99:doe/et/20023-5 Solid waste management of coal conversion residuals from a commercial-size facility environmental engineering aspects. Final report. 1
E 1.99:doe/et/20023-t1 Screening Prosopis (mesquite) species for biofuel production on semi-arid lands. Final report, April 1, 1978-March 30, 1981 1