Call Number (LC) | Title | Results |
---|---|---|
E 1.99:doe/go-102006-2200 | Low Wind Speed Technology Phase I Advanced Independent Pitch Control; Advanced Energy System, Inc. | 1 |
E 1.99:doe/go-102006-2201 | Low Wind Speed Technology Phase II Developing Techniques to Evaluate the Designs and Operating Environments of Offshore Wind Turbines in the Mid-Atlantic and Lower Great Lakes Region; AWS Truewind, LLC. | 1 |
E 1.99:doe/go-102006-2202 | Low Wind Speed Technology Phase I Evaluation of Design and Construction Approaches for Economical Hybrid Steel/Concrete Wind Turbine Towers; BERGER/ABAM Engineers Inc. | 1 |
E 1.99:doe/go-102006-2203 | Low Wind Speed Technology Phase II Breakthrough in Power Electronics from Silicon Carbide; Peregrine Power LLC. | 1 |
E 1.99:doe/go-102006-2204 | Wind Partnerships for Advanced Component Technology WindPACT Advanced Wind Turbine Drivetrain Designs; Northern Power Systems, Inc. | 1 |
E 1.99:doe/go-102006-2205 | Low Wind Speed Technology Phase I Advanced Power Electronics for Low Wind Speed Turbine Applications; Northern Power Systems, Inc. | 1 |
E 1.99:doe/go-102006-2206 | Low Wind Speed Technology Phase II Offshore Floating Wind Turbine Concepts Fully Coupled Dynamic Response Simulations; Massachusetts Institute of Technology. | 1 |
E 1.99:doe/go-102006-2207 | Low Wind Speed Technology Phase II Development of an Operations and Maintenance Cost Model for LWST; Global Energy Concepts. | 1 |
E 1.99:doe/go-102006-2208 | Low Wind Speed Technology Phase II Investigation of the Application of Medium-Voltage Variable-Speed Drive Technology to Improve the Cost of Energy from Low Wind Speed Turbines; Behnke, Erdman and Whitaker Engineering, Inc. | 1 |
E 1.99:doe/go-102006-2209 | Low Wind Speed Technology Phase II Low Wind Speed Turbine Developments in Convoloid Gearing; Genesis Partners LP. | 1 |
E 1.99:doe/go-102006-2213 | Geothermal Technologies Program Texas. | 1 |
E 1.99:doe/go-102006-2214 | Geothermal Technologies Program Wyoming. | 1 |
E 1.99:doe/go-102006-2218 | Wind/Water Nexus | 1 |
E 1.99:doe/go-102006-2222 |
Reduce Air Infiltration in Furnaces Reduce Air Infiltration in Furnaces - Process Heating Tip Sheet #5 |
2 |
E 1.99:doe/go-102006-2223 |
Reduce Radiation Losses from Heating Equipment Reduce Radiation Losses from Heating Equipment - Process Heating Tip Sheet #7 |
2 |
E 1.99:doe/go-102006-2224 |
Load Preheating Using Flue Gases from a Fuel-Fired Heating System Load Preheating Using Flue Gases from a Fuel-Fired Heating System - Process Heating Tip Sheet #9 |
2 |
E 1.99:doe/go-102006-2225 | Using Waste Heat for External Processes - Process Heating Tip Sheet #10 | 1 |
E 1.99:doe/go-102006-2226 |
Trim or Replace Impellers on Oversized Pumps Trim or Replace Impellers on Oversized Pumps Pumping Systems Tip Sheet #7. |
2 |
E 1.99:doe/go-102006-2227 | Optimize Parallel Pumping Systems | 1 |
E 1.99:doe/go-102006-2232 | Low Wind Speed Technology Phase II Development of a 2-MW Direct-Drive Wind Turbine for Low Wind Speed Sites; Northern Power Systems. | 1 |