Call Number (LC) Title Results
E 1.99:doe/go-102006-2200 Low Wind Speed Technology Phase I Advanced Independent Pitch Control; Advanced Energy System, Inc. 1
E 1.99:doe/go-102006-2201 Low Wind Speed Technology Phase II Developing Techniques to Evaluate the Designs and Operating Environments of Offshore Wind Turbines in the Mid-Atlantic and Lower Great Lakes Region; AWS Truewind, LLC. 1
E 1.99:doe/go-102006-2202 Low Wind Speed Technology Phase I Evaluation of Design and Construction Approaches for Economical Hybrid Steel/Concrete Wind Turbine Towers; BERGER/ABAM Engineers Inc. 1
E 1.99:doe/go-102006-2203 Low Wind Speed Technology Phase II Breakthrough in Power Electronics from Silicon Carbide; Peregrine Power LLC. 1
E 1.99:doe/go-102006-2204 Wind Partnerships for Advanced Component Technology WindPACT Advanced Wind Turbine Drivetrain Designs; Northern Power Systems, Inc. 1
E 1.99:doe/go-102006-2205 Low Wind Speed Technology Phase I Advanced Power Electronics for Low Wind Speed Turbine Applications; Northern Power Systems, Inc. 1
E 1.99:doe/go-102006-2206 Low Wind Speed Technology Phase II Offshore Floating Wind Turbine Concepts Fully Coupled Dynamic Response Simulations; Massachusetts Institute of Technology. 1
E 1.99:doe/go-102006-2207 Low Wind Speed Technology Phase II Development of an Operations and Maintenance Cost Model for LWST; Global Energy Concepts. 1
E 1.99:doe/go-102006-2208 Low Wind Speed Technology Phase II Investigation of the Application of Medium-Voltage Variable-Speed Drive Technology to Improve the Cost of Energy from Low Wind Speed Turbines; Behnke, Erdman and Whitaker Engineering, Inc. 1
E 1.99:doe/go-102006-2209 Low Wind Speed Technology Phase II Low Wind Speed Turbine Developments in Convoloid Gearing; Genesis Partners LP. 1
E 1.99:doe/go-102006-2213 Geothermal Technologies Program Texas. 1
E 1.99:doe/go-102006-2214 Geothermal Technologies Program Wyoming. 1
E 1.99:doe/go-102006-2218 Wind/Water Nexus 1
E 1.99:doe/go-102006-2222 Reduce Air Infiltration in Furnaces
Reduce Air Infiltration in Furnaces - Process Heating Tip Sheet #5
2
E 1.99:doe/go-102006-2223 Reduce Radiation Losses from Heating Equipment
Reduce Radiation Losses from Heating Equipment - Process Heating Tip Sheet #7
2
E 1.99:doe/go-102006-2224 Load Preheating Using Flue Gases from a Fuel-Fired Heating System
Load Preheating Using Flue Gases from a Fuel-Fired Heating System - Process Heating Tip Sheet #9
2
E 1.99:doe/go-102006-2225 Using Waste Heat for External Processes - Process Heating Tip Sheet #10 1
E 1.99:doe/go-102006-2226 Trim or Replace Impellers on Oversized Pumps
Trim or Replace Impellers on Oversized Pumps Pumping Systems Tip Sheet #7.
2
E 1.99:doe/go-102006-2227 Optimize Parallel Pumping Systems 1
E 1.99:doe/go-102006-2232 Low Wind Speed Technology Phase II Development of a 2-MW Direct-Drive Wind Turbine for Low Wind Speed Sites; Northern Power Systems. 1