Call Number (LC) Title Results
E 1.99:egg-ep--9918 Feasibility studies for the Sonic Sensor System for noninvasive temperature measurement in the food processing industry 1
E 1.99:egg-ep-9982 Geopressured habitat A literature review. 1
E 1.99:egg-ep--10152 Electric and Hybrid Vehicle Program; Site Operator Program. Quarterly progress report, October--December 1991 1
E 1.99:egg-ep-10152 Electric and Hybrid Vehicle Program; Site Operator Program 1
E 1.99:egg-ep--10295 Electric and hybrid vehicle program; Site Operator Program. Quarterly progress report, January--March 1992 (Second quarter of fiscal year 1992) 1
E 1.99:egg-ep-10295 Electric and hybrid vehicle program; Site Operator Program 1
E 1.99:egg-ep--10296 The impact of electric vehicles on CO₂ emissions. Final report 1
E 1.99:egg-ep-10296 The impact of electric vehicles on CO[sub 2] emissions 1
E 1.99:egg-ep--10500 A comparative analysis of alternative fuels for the INEL vehicle fleet 1
E 1.99:egg-ep-10500 A comparative analysis of alternative fuels for the INEL vehicle fleet 1
E 1.99:egg-ep--10557 An integrated approach to reservoir engineering at Pleasant Bayou Geopressured-Geothermal reservoir 1
E 1.99:egg-ep--10715 Air classification theory and design for municipal solid waste processing. Final report 1
E 1.99:egg-ep-10715 Air classification theory and design for municipal solid waste processing 1
E 1.99:egg-ep--10787 Generalization of vapor pressure lowering effects in an existing geothermal simulator 1
E 1.99:egg-ep--10948 Preliminary evaluation of the University of South Florida Mobile Data Acquisition System, the Idaho National Engineering Laboratory Versatile Data Acquisition System, and the Autologger Vehicle User Survey System produced by Instrumental Solutions of Ottawa, Canada for the Site Operator Program Field Data Collection 1
E 1.99:egg-ep--10949 Energy storage specification requirements for hybrid-electric vehicle 1
E 1.99:egg-ep--10999 EDD-7 Electric Charge Point Meter test results 1
E 1.99: egg-ep--11237-qtr-3 Electric and hybrid vehicle program Site operator program. Quarterly progress report, April--June, 1994 (3rd quarter of FY-1994) 1
E 1.99:egg-ep--11320 Performance testing of the AC propulsion ELX electric vehicle 1
E 1.99:egg-ep-11414 Geothermal well site restoration and plug and abandonment of wells, DOE Gladys McCall test site, Cameron Parish, Louisiana and DOE Willis Hulin test site, Vermillion Parish, Louisiana
Geothermal Well Site Restoration and Plug and Abandonment of Wells
2