E 1.99: egg/itr-84-01
|
Internal Technical Report, Hydrothermal Injection Program - East Mesa 1983-84 Test Data |
1 |
E 1.99:egg-llw--8843-91-2
|
Performance assessments for near-surface low-level radioactive waste disposal facilities |
1 |
E 1.99:egg-llw--8843-91-3
|
Portland cement A solidification agent for low-level radioactive waste. |
1 |
E 1.99:egg-llw-9343-rev.1
|
Approaches to LLW disposal site selection and current progress of host states |
1 |
E 1.99:egg-llw--9525
|
Commercial radioactive waste minimization program development guidance |
1 |
E 1.99:egg-llw-9525
|
Commercial radioactive waste minimization program development guidance |
1 |
E 1.99:egg-llw--10135-92-1
|
Managing commercial low-level radioactive waste beyond 1992 Transportation planning for a LLW disposal facility. |
1 |
E 1.99:egg-llw--10135-92-2
|
Commercial low-level radioactive waste transportation safety history |
1 |
E 1.99:egg-llw--10135-92-3
|
Impact of revised 10 CFR 20 on existing performance assessment computer codes used for LLW disposal facilities |
1 |
E 1.99:egg-llw--11140
|
Estimating costs of low-level radioactive waste disposal alternatives for the Commonwealth of Massachusetts |
1 |
E 1.99:egg-loft-5276
|
LOFT Monthly Progress Report for September 1980 |
1 |
E 1.99:egg-loft-5290
|
LOFT Monthly Progress Report for October 1980 |
1 |
E 1.99:egg-loft-5316
|
LOFT Monthly Progress Report for November 1980 |
1 |
E 1.99:egg-loft-5336
|
LOFT Monthly Progress Report for December 1980 |
1 |
E 1.99:egg-loft-5408
|
Evaluation of Reattachment Welds for LOFT Cladding Thermocouples |
1 |
E 1.99:egg-loft-5554
|
Summary Results of the Neptun Boil-Off Experiments to Investigate the Accuracy and Cooling Influence of LOFT Cladding-Surface Thermocouples (System 00) |
1 |
E 1.99:egg/ltr-141-86-suppl.1
|
Stress analysis of ultrasonic density detector for LOFT core inlet steady-state and LOCE conditions. Supplement 1 |
1 |
E 1.99:egg/ltr-141-92
|
Stress analysis of the retaining stud for the ECC rake |
1 |
E 1.99:egg/ltr-141-195
|
LOFT DTT rake pin stress analysis |
1 |
E 1.99:egg/ltr-143-12
|
NIS power range setpoints for Phase-B operation |
1 |