Call Number (LC) Title Results
E 1.99:hw--7-2119 Tolerable concentration of product in drinking water 1
E 1.99:hw--7-2172 Spectroscopic analysis of pile gas 1
E 1.99:hw-7-2226 100-D unit purge 1
E 1.99:hw--7-2306 Minutes of meeting on Columbia River studies 1
E 1.99:hw--7-2562 Allowable temperature rise in tubes of the piles Precautions against boiling. 1
E 1.99:hw--7-2580 Special investigation of unusual incidents of August 29, 1945 at 100-B and September 7, 1945 at 100-F 1
E 1.99:hw--7-2722 Unusual incident---105-D, October 11, 1945 1
E 1.99:hw--7-2744 Procedure for improving temperature distribution via rods and columns -- B Pile 1
E 1.99:hw--7-2984 Monthly, 100 Area technical activities report, Physics, 10-25-45--May 1947 1
E 1.99:hw--7-3005-del Xenon and iodine concentrations in the environs of the T and B Plant 1
E 1.99:hw--7-3024 Polonium production neutron flux in bismuth columns 1
E 1.99:hw--7-3070 300 Area December 11 through December 17. 1
E 1.99:hw--7-3188 100 Areas, January 1 through January 7, 1946 1
E 1.99:hw--7-3212 Effect of stainless steel thimbles on pile reactivity 1
E 1.99:hw--7-3307 100 Areas, January 15 through January 21 1
E 1.99:hw--7-3308 300 Area, January 15--January 21 1
E 1.99:hw--7-3368 300 Area, January 22--January 28 1
E 1.99:hw--7-3392 100 Areas, January 29 through February 4, 1946 1
E 1.99:hw--7-3424 300 Area monthly report for January 1
E 1.99:hw--7-3438 Polonium production Predicted concentration vs customer̀€s assays. 1