E 1.99:ido-16871-4
|
FUNDAMENTALS IN THE OPERATION OF NUCLEAR TEST REACTORS. VOLUME 4. ENGINEERING AND DESIGN CONSIDERATIONS FOR IN-PILE TESTS |
1 |
E 1.99:ido-16871-5
|
FUNDAMENTALS IN THE OPERATION OF NUCLEAR TEST REACTORS. VOLUME 5. ADVANCED TEST REACTOR DESIGN AND OPERATION |
1 |
E 1.99:ido-16876
|
THE ELECTRON RADIOLYSIS OF BENZENE-M-TERPHENYL AND PERDEUTEROBENZENE-M- TERPHENYL MIXTURES |
1 |
E 1.99:ido-16877
|
CATALYTIC HYDROCRACKING OF HIGH BOILER IN NUCLEAR REACTOR COOLANT |
1 |
E 1.99:ido-16878
|
A MECHANICAL NEUTRON FILTER FOR A CRYSTAL SPECTROMETER |
1 |
E 1.99:ido-16879
|
POWER-BURST FACILITY (PBF) CONCEPTUAL DESIGN |
1 |
E 1.99:ido-16880-1
|
SCINTILLATION SPECTROMETRY. GAMMA-RAY SPECTRUM CATALOGUE. 2nd Edition. Volume 1 of 2 |
1 |
E 1.99:ido-16880-2
|
SCINTILLATION SPECTROMETRY. GAMMA-RAY SPECTRUM CATALOGUE. 2nd Edition. Volume 2 of 2 |
1 |
E 1.99:ido--16881
|
EDP procedures in technical library operations |
1 |
E 1.99:ido-16883
|
REPORT OF THE SPERT I DESTRUCTIVE TEST PROGRAM ON AN ALUMINUM, PLATE-TYPE, WATER-MODERATED REACTOR |
1 |
E 1.99:ido-16884
|
TRANSIENT TEMPERATURE DISTRIBUTIONS IN THE SPERT I D-12/25 FUEL PLATES DURING SHORT-PERIOD POWER EXCURSIONS |
1 |
E 1.99:ido-16886
|
NON-DESTRUCTIVE AND DESTRUCTIVE TRANSIENT TESTS OF THE SPERT I-D, FULLY ENRICHED, ALUMINUM-PLATE-TYPE CORE DATA SUMMARY REPORT. |
1 |
E 1.99:ido-16887
|
SPERT III SPUN CAST PIPE EXPERIENCE |
1 |
E 1.99:ido-16888
|
SPERT II REACTOR FACILITY |
1 |
E 1.99:ido-16889
|
EVALUATION OF SURFACE ATTACHED THERMOCOUPLES DURING FORCED CONVECTION HEAT TRANSFER |
1 |
E 1.99:ido-16891
|
SELF-LIMITING EXCURSION TESTS OF A HIGHLY ENRICHED PLATE-TYPE D$sub 2$O- MODERATED REACTOR. PART I. INITIAL TEST SERIES |
1 |
E 1.99:ido-16893
|
SPERT PROJECT QUARTERLY TECHNICAL REPORT, JANUARY-MARCH 1963 |
1 |
E 1.99:ido-16894
|
ETR FLUX MEASUREMENTS FOR CYCLES 51B AND 54 |
1 |
E 1.99:ido-16896
|
ARMF II REGULATING ROD READOUT AND SHIM ROD DRIVE AND POSITION DISPLAY |
1 |
E 1.99:ido-16898
|
MATERIALS TESTING REACTOR-ENGINEERING TEST REACTOR TECHNICAL BRANCHES QUARTERLY REPORT, JANUARY 1-MARCH 31, 1963 |
1 |