Call Number (LC) Title Results
E 1.99:ineel/ext-05-02581 Next Generation Nuclear Plant Research and Development Program Plan 2
E 1.99:ineel/ext-05-02583 Pulsed Photonuclear Assessment (PPA) Technique CY 04 Year-end Progress Report. 1
E 1.99:ineel/ext-05-02593 Computation of Dancoff Factors for Fuel Elements Incorporating Randomly Packed TRISO Particles 1
E 1.99:ineel/ext-05-02602 Hydrogen Reduction of Ferric Ions for Use in Copper Electrowinning 1
E 1.99:ineel/ext-05-02613 Vendor System Vulnerability Testing Test Plan 1
E 1.99:ineel/ext--05-02615 Development of Improved Models and Designs for Coated-Particle Gas Reactor Fuels -- Final Report under the International Nuclear Energy Research Initiative (I-NERI) 1
E 1.99:ineel/ext-05-02616 Occupational Safety Review of High Technology Facilities 1
E 1.99:ineel/ext-05-02643 Software Requirements Specification Verifiable Fuel Cycle Simulation (VISION) Model 2
E 1.99:ineel/ext-05-02646 Advanced Fuel Cycle Initiative - Projected Linear Heat Generation Rate and Burnup Calculations 1
E 1.99:ineel/ext-05-02649 Power Systems Control Architecture 1
E 1.99:ineel/ext-05-02658 Implementation of Molten Salt Properties into RELAP5-3D/ATHENA 1
E 1.99:ineel/ext-05-02662 Interim Status Report on the Design of the Gas-Cooled Fast Reactor (GFR) 2
E 1.99:INEEL/EXT--97-00065-Rev.1 Contractor report to the Department of Energy on opportunities for integration of environmental management activities across the complex (predecisional draft). Revision 1 1
E 1.99:ineel/ext--97-0132(96) 1996 LMITCO environmental monitoring program report for the Idaho National Engineering and Environmental Laboratory 1
E 1.99:INEEL/EXT--97-00133-3rdQtr Idaho National Engineering and Environmental Laboratory radiological control performance indicator report. Third quarter, calendar year 1997 1
E 1.99:INEEL/EXT--97-00133(4thQTR) Idaho National Engineering and Environmental Laboratory Radiological Control Performance Indicator Report; Fourth Quarter - Calendar Year 1997 1
E 1.99:INEEL/EXT--97-00239 Summary of activities at the Engineered Barriers Test Facility, October 1, 1995 to January 31, 1997, and initial data 1
E 1.99:INEEL/EXT--97-00493 A contractor report to the Department of Energy on environmental management baseline programs and integration opportunities (discussion draft) 1
E 1.99:INEEL/EXT--97-00496 Preparation of plutonium waste forms with ICPP calcined high-level waste 1
E 1.99:INEEL/EXT--97-00587 ICPP environmental monitoring report for CY-1996 1