Call Number (LC) | Title | Results |
---|---|---|
E 1.99: navdocks p-51 | DESIGN OF PROTECTIVE STRUCTURES (A NEW CONCEPT OF STRUCTURAL BEHAVIOR) | 1 |
E 1.99:navv | Network Architecture Verification & Validation Tool. | 1 |
E 1.99: navweps-7949 | SOME ASPECTS OF COUPLING BETWEEN EXPLOSIVES AND ROCKS | 1 |
E 1.99:nbl-127 | SEMIANNUAL PROGRESS REPORT FOR THE PERIOD JULY 1955 THROUGH DECEMBER 1955 | 1 |
E 1.99:nbl-132 | THE POLAROGRAPHIC DETERMINATION OF URANIUM (VI) IN URANIUM TETRAFLUORIDE | 1 |
E 1.99:nbl-165 | SEMI-ANNUAL PROGRESS REPORT FOR THE PERIOD JANUARY 1960 THROUGH JUNE 1960 | 1 |
E 1.99:nbl--243 | OPERATING PRACTICES USED IN PLUTONIUM ANALYTICAL LABORATORIES. | 1 |
E 1.99:nbl--250 | ANNUAL PROGRESS REPORT FOR THE PERIOD JULY 1968 THROUGH JUNE 1969. | 1 |
E 1.99:nbl--258 | ANNUAL PROGRESS REPORT FOR THE PERIOD JULY 1969--JUNE 1970. | 1 |
E 1.99:nbl--262 |
ANNUAL PROGRESS REPORT FOR THE PERIOD JULY 1970--JUNE 1971. FOCAL COMPUTER PROGRAM FOR THE CALCULATION OF ²³⁸Pu/²³⁹Pu RATIOS DETERMINED BY ALPHA SPECTROMETRY. |
2 |
E 1.99:nbl--265 | ANNUAL PROGRESS REPORT FOR THE PERIOD JULY 1971--JUNE 1972. | 1 |
E 1.99:nbl--267 |
Annual progress report for the period July 1972 through June 1973 Annual Progress Report for the Period July 1972 through June 1973 |
2 |
E 1.99:nbl--272 | Annual progress report for the period July 1973 through June 1974 | 1 |
E 1.99:nbl--274 | Results of the general analytical evaluation program for uranium hexafluoride, Phase I | 1 |
E 1.99:nbl--277 | Annual progress report, July 1974--June 1975 | 1 |
E 1.99:nbl-289 | Progress report, July 1975--September 1977 | 1 |
E 1.99:nbl-293 | Progress report, October 1978-September 1979 | 1 |
E 1.99:nbl-304 | DOE research and development report. Progress report, October 1980-September 1981 | 1 |
E 1.99:nbl-316 | The production and certification of a plutonium equal-atom reference material NBL CRM 128. | 1 |
E 1.99:nbl--327 | New Brunswick Laboratory progress report, October 1991--September 1992 | 1 |