E 1.99:ornl/sub-4269/8
|
Design aspects of the Alpha Repository. I. Preliminary results of facility layout, room stability, and equipment selection efforts. Summary progress report RSI-0024 |
1 |
E 1.99:ornl/sub/4269-9
|
Design aspects of the alpha repository. II. Conceptual layouts of underground storage facilities |
1 |
E 1.99:ornl/sub-4269/10
|
Design aspects of the Alpha Repository III. Uniaxial quasi-static and creep properties of the site rock. Technical memorandum report RSI-0029. |
1 |
E 1.99:ornl/sub-4269/11
|
Design aspects of the alpha repository IV. Structural analysis of excavation geometries. Technical memorandum report RSI-0030. |
1 |
E 1.99:ornl/sub-4269/12
|
Design aspects of the Alpha Repository. V. Suite selection and cost analysis of excavation/hauling systems |
1 |
E 1.99:ornl/sub-4269/14
|
Design aspects of the Alpha Repository. VII. Summary of results for the conceptual facility layout, room stability analysis, and equipment selection. Project summary report RSI-0033 |
1 |
E 1.99:ornl/sub-4269/15
|
Documentation of the heat conduction code TRANCO |
1 |
E 1.99:ornl/sub-4269/16
|
Factor-of-safety formulations for linear and parabolic failure envelopes for rock. Technical memorandum report RSI-0038. [Underground room-and-pillar design] |
1 |
E 1.99:ornl/sub-4269/17
|
Documentation of the thermo-viscoelastic code TEVCO. Memorandum report RSI-0039 |
1 |
E 1.99:ornl/sub-4269/18
|
Description of the thermoelastic/plastic computer program TEPCO. Memorandum report RSI-0040 |
1 |
E 1.99:ornl/sub-4269/19
|
Structural analysis of salt cavities formed by solution mining I. Method of analysis and preliminary results for spherical cavities. |
1 |
E 1.99:ornl/sub-4269/20
|
Preliminary analysis of the potential for thermally-induced rock fracture around high-level waste containers |
1 |
E 1.99:ornl/sub-4269/21
|
Experimental consolidation of granulated rock salt with application to sleeve buckling. Technical memorandum report RSI-0044 |
1 |
E 1.99:ornl/sub-4356
|
Further HTGR core support structure reliability studies. Interim report No. 1 |
1 |
E 1.99:ornl/sub--4362/14
|
Remotely operable modular shear system for shearing nuclear reactor spent fuel conceptual design. Final summary report |
1 |
E 1.99:ornl/sub-4380/1
|
Intermediate size LWR plant study for process heat plus power. Volume 1. Executive summary |
1 |
E 1.99:ornl/sub-4380/2
|
Intermediate size LWR plant study for process heat plus power main report. Volume 2 of 3 volumes. [BWR] |
1 |
E 1.99:ornl/sub-4380/3
|
Intermediate size LWR plant study for process heat plus power. Volume 3. Appendices |
1 |
E 1.99:ornl/sub-4380-5
|
Assessment of utilization of thorium in BWRs |
1 |
E 1.99:ornl/sub-4390/3
|
400 MWe Consolidated Nuclear Steam System (CNSS). 1200 MWt/conceptual design study. Executive summary |
1 |