Call Number (LC) Title Results
EP 1.23/8:600/7-78-132 a A data reduction system for cascade impactors / 1
EP 1.23/8:600/7-78-133 Cleanup efficiency and biological effects of a fuel oil spill in cold weather : the 1977 Bouchard no. 65 oil spill in Buzzards Bay, Massachusetts / 1
EP 1.23/8:600/7-78-134 Guidelines for preparing environmental test plans for coal gasification plants / 1
EP 1.23/8:600/7-78-135 Characterization of solid residues from fluidized-bed combustion units / 1
EP 1.23/8:600/7-78-136 a Field tests of industrial stoker coal-fired boilers for emissions control and efficiency improvement, site A / 1
EP 1.23/8:600/7-78-136 b Field tests of industrial stoker coal-fired boilers for emissions control and efficiency improvement, site A, data supplement / 1
EP 1.23/8:600/7-78-137 Evaluation of the U.S. Geological Survey Laboratory, Atlanta, Georgia / 1
EP 1.23/8:600/7-78-139 Survey of projects concerning conventional combustion environmental assessments / 1
EP 1.23/8:600/7-78-140 A program for the environmental assessment of conventional combustion processes / 1
EP 1.23/8:600/7-78-141 EPA fabric filtration studies / 1
EP 1.23/8:600/7-78-142 Electrostatic effects in fabric filtration / 1
EP 1.23/8:600/7-78-143 Investigation of advanced thermal-chemical concepts for obtaining improved MSW-derived products / 1
EP 1.23/8:600/7-78-146 An assessment of mercury emissions from fossil fueled power plants / 1
EP 1.23/8:600/7-78-149 Remote monitoring of coal strip mine rehabilitation / 1
EP 1.23/8:600/7-78-151 Status of IERL-RTP environmental methodologies for fossil energy processes / 1
EP 1.23/8:600/7-78-152 Optimization of design specifications for large dry cooling systems / 1
EP 1.23/8:600/7-78-153 a Low-sulfur Western coal use in existing small and intermediate size boilers / 1
EP 1.23/8:600/7-78-153 b Sulfur retention in coal ash / 1
EP 1.23/8:600/7-78-156 Overburden mineralogy as related to ground-water chemical changes in coal strip mining / 1
EP 1.23/8:600/7-78-157 Water consumption and costs for various steam electric power plant cooling systems / 1