Call Number (LC) | Title | Results |
---|---|---|
I 27.70:R 43x | Animas-La Plata Project : Ridges Basin dam and reservoir pre-construction facilities relocations : final environmental assessment / | 1 |
I 27.70:R 43x/finding | Animas-La Plata Project : Ridges Basin dam and reservoir pre-construction facilities relocations : finding of no significant impact / | 1 |
I 27.70:W 22 | Navajo-Gallup water supply project, New Mexico- Arizona / | 1 |
I 27.70:W 22/ | Navajo-Gallup water supply project, New Mexico-Arizona | 1 |
I 27.71: |
Annual report. Annual report and ... annual operating plan for Colorado River system reservoirs. Annual operating plan for Colorado River reservoirs. |
6 |
I 27.71/2: |
Colorado River Storage Project and participating projects in fiscal year. Colorado River Storage Project and participating projects in fiscal year . Colorado River storage project and participating projects, annual report. Colorado River Storage Project and participating projects in fiscal year .. |
4 |
I 27.71/3: | Annual operating plan for Colorado River reservoirs. | 1 |
I 27.72:1-75 | Development of concrete-polymer materials by the Bureau of Reclamation : a summary report / | 1 |
I 27.72:1-77 | Initial study of vinyl ester polymer shotcrete / | 1 |
I 27.72:2-77 | Limnological reconnaissance of Seminoe Reservoir, Wyoming / | 1 |
I 27.72:3-75 | Application developments of concrete-polymer materials : a summary report / | 1 |
I 27.72:4-77 | Determination of polymer impregnation depth in concrete / | 1 |
I 27.72:5-77 | Laboratory facilities for research and development of water systems control automation / | 1 |
I 27.72:7-75 | Deflections of buried reinforced plastic mortar pipe joints / | 1 |
I 27.72:7-77 | Vinyl ester polymer concrete and experimental repair of Madera Canal drop structure / | 1 |
I 27.72:8-75 | Prediction of dissolved gas at hydraulic structures / | 1 |
I 27.72:8-77 | Abatement of elevated ozone levels from powerplant generators / | 1 |
I 27.72:9-75 | Concrete performance in Yellowtail Dam, Montana : 10-year core report / | 1 |
I 27.72:10-77 | Pilot plant studies for the removal of hydrogen sulfide-Paradox Valley unit, Dolores River project, Colorado : a summary report / | 1 |
I 27.72:11-75 | Soil investigations at Del City concrete pipeline breaks / | 1 |