Call Number (LC) Title Results
TC550 .A44 2018 Monitoring dam performance : instrumentation and measurements / 1
TC550 .C446 2016 Seismic safety of high arch dams / 1
TC550 .D36 2017 Dam safety management : operational phase of the dam life cycle. 1
TC550 .I56 1979 Deterioration cases collected and their preliminary assessment / 1
TC550 .I58 2015eb Dam protections against overtopping and accidental leakage : proceedings of the 1st International Seminar on Dam Protections against Overtopping and Accidental Leakage, Madrid, Spain, 24-26 November 2014 / 1
TC550 .R43 Report on Red Willow Dam and Reservoir and associated works, Nebraska : multiple-purpose facilities in Frenchman-Cambridge Division, Missouri River Basin Project. 1
TC550 .S45 2016 Selecting seismic parameters for large dams : guidelines. 1
TC550.2 Hydraulic fracturing in earth-rock fill dams /
Internal erosion of dams and their foundations : selected and reviewed papers from the Workshop on Internal Erosion and Piping of Dams and their Foundations, Aussois, France, 24-27 April 2005 /
3
TC550.2 .L53 2021 Hydraulics of levee overtopping / 2
TC550.2 .S56 1996 Dam breach modeling technology / 1
TC550.2 .S56 1996eb Dam breach modeling technology / 1
TC550.2 .Z44 2016 Dam failure mechanisms and risk assessment / 1
TC550.2 .Z44 2016eb Dam failure mechanisms and risk assessment / 3
TC555 Labyrinth and Piano Key Weirs II : PKW 2013 : proceedings of the Second International Workshop on Labyrinth and Piano Key Weirs 2013, Chatou, Paris, France, 20-22 November 2013 / 2
TC555 .E53 2006 Energy dissipators / 1
TC555 .E54 1995 Energy dissipators / 1
TC555 .H34 1992 Energy dissipators and hydraulic jump / 1
TC555 .H37 Determination of spillway requirements for high dams / 1
TC555 .I57 2000eb Hydraulics of stepped spillways : proceedings of the International Workshop on Hydraulics of Stepped Spillways, Zürich, Switzerland, March 22-24, 2000 / 1
TC555 .I58 2011eb Labyrinth and piano key weirs PKW 2011 / 2