Call Number (LC) | Title | Results |
---|---|---|
TD 2.30:99-138 | An introduction to the deep soil mixing methods as used in geotechnical applications | 1 |
TD 2.30:99-139 | The HERMES bridge inspector | 1 |
TD 2.30:99-140 | National model statewide application of data collection and management technology to improve highway safety. | 1 |
TD 2.30:99-142 | LTPP pavement maintenance materials SHRP joint reseal experiment, final report. | 1 |
TD 2.30:99-143 |
LTPP pavement maintenance materials SHRP crack treatment experiment, final report. LTPP pavement maintenance materials : SHRP joint reseal experiment, final report / |
2 |
TD 2.30:99-145 | Time to corrosion of reinforcing steel in concrete containing calcium nitrite | 1 |
TD 2.30:99-146 | Materials and procedures for repair of joint seals in Portland cement concrete pavements : manual of practice / | 1 |
TD 2.30:99-151 |
LTPP pavement maintenance materials SPS-4 supplemental joint seal experiment, final report. LTPP pavement maintenance materials : SPS-4 supplemental joint seal experiment, final report / |
2 |
TD 2.30:99-152 | Materials and procedures for rapid repair of partial-depth spalls in concrete pavements, manual of practice / | 1 |
TD 2.30:99-153 |
LTPP pavement maintenance materials PCC partial-depth spall repair experiment, final report. LTPP pavement maintenance materials : PCC partial-depth spall repair experiment, final report / |
2 |
TD 2.30:99-156 | Enhanced abutment scour studies for compound channels | 1 |
TD 2.30:99-158 | Heated bridge technology report on ISTEA sec. 6005 program / | 1 |
TD 2.30:99-162 | Videotapes explain the how and why of LTPP's revised resilient modulus laboratory tests and procedures | 1 |
TD 2.30:99-163 | Working with your FWD calibration center videotape | 1 |
TD 2.30:99-167 | An introduction to the deep mixing methods as used in geotechnical applications. | 1 |
TD 2.30:99-169 | LTPP analysis putting the data to work. | 1 |
TD 2.30:99-170 | Extrapolation of pile capacity from non-failed load tests | 1 |
TD 2.30:99-176 | Sealing and filling cracks in asphalt pavements | 1 |
TD 2.30:99-177 | Portland cement concrete (PCC) partial-depth spall repair | 1 |
TD 2.30:99-190 | User's manual for BRI-STARS (BRidge Stream Tube model for Alluvial River Simulation) | 1 |