Call Number (LC) | Title | Results |
---|---|---|
TF205 .S43 1936 | Field engineering : a handbook of the theory and practice of railway surveying, location and construction / | 1 |
TF205 .S53 2021 | ||
TF216 .B72 |
A system of useful formul©Œ. adapted to the practical operations of locating and constructing railroads; a paper read before the Boston society of civil engineers, A system of useful formulae adapted to the practical operations of locating and constructing railroads: a paper read before the Boston Society of Civil Engineers December, MDCCCXLIX / |
2 |
TF216 .C3 | Solution of railroad problems by the slide rule. | 1 |
TF216 .M4 | Railroad vertical curves and spirals / | 1 |
TF216 .S28 1968 | Taschenbuch zum Abstecken von Kreisbogen mit und ohne Übergangsbogen / | 1 |
TF216 .T778 | The field practice of laying out circular curves for rail-roads. | 1 |
TF217 .J7 | The practical railway spiral : with short working formulas and full tables of deflection angles: complete notes of illustrative examples / | 1 |
TF217 .S435 1891 | The railroad spiral : the theory of the compound transition curve reduced to practical formulæ and rules for application in field work : with complete tables of deflections and ordinates for five hundred spirals / | 1 |
TF217 .S8 | The six-chord spiral / | 1 |
TF217 .T13 1908eb | The railway transition spiral / | 1 |
TF217 .T13 1910 | The railway transition spiral / | 1 |
TF220 .L47 2015eb | Railway geotechnics / | 2 |
TF222 .D26 | Formul©Œ for the calculation of railroad excavation and embankment, | 1 |
TF222 .F6 | Earthwork haul and overhaul : including economic distribution / | 1 |
TF222 .H84 | Earthwork mensuration, on the basis of the prismoidal formula. | 1 |
TF222 .T762 |
A new method of calculating the cubic contents of excavations and embankments, by the aid of diagrams / A new method of calculating the cubic contents of excavations and embankments, |
2 |
TF222 .W28 | New theorems, tables, and diagrams, for the computation of earth-work. Designed for the use of engineers in preliminary and final estimates, of students in engineering, and of contractors and other non-professional computers. | 1 |
TF222 .W45 | Methods for the computation from diagrams of preliminary and final estimates of railway earthwork, | 1 |
TF230 .B6 | The story of tunnels / | 1 |