Y 3.N 88:56-2/94-18
|
Accuracy of motor-operated valve diagnostic equipment (responses to supplement 5 to Generic Letter 89-10) |
1 |
Y 3.N 88:56-2/94-19
|
Emergency diesel generator vulnerability to failure from cold fuel oil |
1 |
Y 3.N 88:56-2/94-20
|
Common-cause failures due to inadequate design control and dedication |
1 |
Y 3.N 88:56-2/94-21
|
Regulatory requirements when no operations are being performed. |
1 |
Y 3.N 88:56-2/94-22
|
Fire endurance and ampacity derating test results for 3-hour fire-rated Thermo-Lag 330-1 fire barriers |
1 |
Y 3.N 88:56-2/94-23
|
Guide to hazardous, radioactive, and mixed waste generators on the elements of a waste minimization program |
1 |
Y 3.N 88:56-2/94-24
|
Inadequate maintenance of uninterruptible power supplies and inverters |
1 |
Y 3.N 88:56-2/94-25
|
Failure of containment spray header valve to open due to excessive pressure from inertial effects of water |
1 |
Y 3.N 88:56-2/94-26
|
Personnel hazards and other problems from smoldering fire-retardant material in the drywell of a boiling-water reactor |
1 |
Y 3.N 88:56-2/94-27
|
Facility operating concerns resulting from local area flooding |
1 |
Y 3.N 88:56-2/94-28
|
Potential problems with fire-barrierpenetration seals |
1 |
Y 3.N 88:56-2/94-29
|
Charging pump trip during a loss-of-coolant event caused by low suction pressure |
1 |
Y 3.N 88:56-2/94-30
|
Leaking shutdown cooling isolation valves at Cooper Nuclear Station |
1 |
Y 3.N 88:56-2/94-31
|
Potential failure of Wilco, Lexan-type HN-4-L fire hose nozzles |
1 |
Y 3.N 88:56-2/94-32
|
Revised seismic hazard estimates |
1 |
Y 3.N 88:56-2/94-33
|
Capacitor failures in Westinghouse Eagle 21 plant protection systems |
1 |
Y 3.N 88:56-2/94-34
|
Thermo-lag 330-660 flexi-blanket ampacity derating concerns |
1 |
Y 3.N 88:56-2/94-35
|
NIOSH respiratory user notices, "Inadvertent separation of the mask-mounted regulator (MMR) from the facepiece on the Mine Safety Appliances (MSA) Company MMR self-contained breathing apparatus (SCBA) and status update" |
1 |
Y 3.N 88:56-2/94-36
|
Undetected accumulation of gas in reactor coolant system |
1 |
Y 3.N 88:56-2/94-37
|
Misadministration caused by a bent interstitlal needle during brachytherapy procedure |
1 |