Description
Abstract:The BSR operated at an average power level of 1564 kW for 22.3% of the time during October, November, and December. Water-quality control in both the reactor primary and secondary cooling systems was satisfactory. The PCA is shutdown for shim-safety rod magnets and associated electronic components upgrading.
Item Description:Published through SciTech Connect.
03/01/1987.
"ornl/tm-10350"
"DE87007798"
Hamrick, T.P.; Muggridge, F.E.
Physical Description:Pages: 22 : digital, PDF file.