|
|
|
|
LEADER |
00000cam a2200000xa 4500 |
001 |
b12208329 |
003 |
CoU |
005 |
20220513050510.0 |
006 |
m o d |
007 |
cr ||||||||||| |
008 |
081029s2008 gw a ob 001 0 eng d |
019 |
|
|
|a 259258768
|a 277259410
|a 308161280
|a 536392331
|a 815754049
|
020 |
|
|
|a 9783527622795
|
020 |
|
|
|a 3527622799
|
020 |
|
|
|a 9783527622801
|q (electronic bk.)
|
020 |
|
|
|a 3527622802
|q (electronic bk.)
|
020 |
|
|
|z 3527407596
|q (Cloth)
|
024 |
7 |
|
|a 10.1002/9783527622795
|
035 |
|
|
|a (OCoLC)wol264714665
|
035 |
|
|
|a (OCoLC)264714665
|z (OCoLC)259258768
|z (OCoLC)277259410
|z (OCoLC)308161280
|z (OCoLC)536392331
|z (OCoLC)815754049
|
040 |
|
|
|a DG1
|b eng
|e pn
|c DG1
|d DG1
|d YDXCP
|d DG1
|d OTZ
|d N$T
|d EBLCP
|d BTCTA
|d IDEBK
|d CDX
|d COO
|d CEF
|d B24X7
|d OCLCQ
|d UKMGB
|d OCLCF
|d OCLCQ
|d OCLCO
|d OCLCQ
|d DEBSZ
|d OCLCQ
|d DEBBG
|d IAS
|d OCLCQ
|d DG1
|d OCLCQ
|d LIP
|d OCLCQ
|d MERUC
|d OCLCQ
|d AU@
|d OCLCQ
|d U3W
|d OCLCQ
|d UKAHL
|d OCLCQ
|d S9I
|d OCLCQ
|d EYM
|d OCLCQ
|d OCLCO
|d S2H
|
049 |
|
|
|a GWRE
|
050 |
|
4 |
|a TK1001
|b .S353 2008eb
|
100 |
1 |
|
|a Schlabbach, J.
|q (Jürgen)
|0 http://id.loc.gov/authorities/names/no2002023801
|1 http://isni.org/isni/0000000109752434.
|
245 |
1 |
0 |
|a Power system engineering
|h [electronic resource] :
|b planning, design, and operation of power systems and equipment /
|c Juergen Schlabbach and Karl-Heinz Rofalski.
|
260 |
|
|
|a Weinheim :
|b Wiley-VCH,
|c ©2008.
|
300 |
|
|
|a 1 online resource (xii, 337 pages) :
|b illustrations.
|
336 |
|
|
|a text
|b txt
|2 rdacontent.
|
337 |
|
|
|a computer
|b c
|2 rdamedia.
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier.
|
504 |
|
|
|a Includes bibliographical references (pages 325-329) and index.
|
505 |
0 |
|
|a Power System Engineering; Contents; Foreword; 1 Introduction; 1.1 Reliability, Security, Economy; 1.2 Legal, Political and Social Restrictions; 1.3 Needs for Power System Planning; 1.4 Basic, Development and Project Planning; 1.4.1 Basic Planning; 1.4.2 System Development Planning; 1.4.3 Project Planning; 1.5 Instruments for Power System Planning; 1.6 Further Tasks of Power System Engineering; 2 Power System Load; 2.1 General; 2.2 Load Forecast with Load Increase Factors; 2.3 Load Forecast with Economic Characteristic Data; 2.4 Load Forecast with Estimated Values.
|
505 |
8 |
|
|a 2.5 Load Forecast with Specific Loads and Degrees of Electrification2.6 Load Forecast with Standardized Load Curves; 2.7 Typical Time Course of Power System Load; 3 Planning Principles and Planning Criteria; 3.1 Planning Principles; 3.2 Basics of Planning; 3.3 Planning Criteria; 3.3.1 Voltage Band According to IEC 60038; 3.3.2 Voltage Criteria; 3.3.3 Loading Criteria; 3.3.4 Stability Criteria; 4 Economic Consideration and Loss Evaluation; 4.1 Present Value and Annuity Method; 4.2 Evaluation of Losses; 4.2.1 Energy Losses; 4.2.2 Power Losses; 5 Topologies of Electrical Power Systems.
|
505 |
8 |
|
|a 5.1 Development of Power Systems5.2 Recommended Voltage Levels; 5.3 Topology of Power Systems; 5.3.1 Radial Systems; 5.3.2 Ring-Main Systems; 5.3.3 Meshed Systems at HV and MV Levels; 5.3.4 Meshed Systems at the LV Level; 5.4 Special Operating Considerations; 6 Arrangement in Gridstations and Substations; 6.1 Busbar Arrangements; 6.1.1 General; 6.1.2 Single Busbar without Separation; 6.1.3 Single Busbar with Sectionalizer; 6.1.4 Special H-Arrangement; 6.1.5 Double Busbar Arrangement; 6.1.6 Double Busbar with Reserve Busbar; 6.2 Arrangement in Switchyards; 6.2.1 Breakers and Switches.
|
505 |
8 |
|
|a 6.2.2 Incoming and Outgoing Feeders6.2.3 Current Transformers; 6.2.4 Voltage Transformers; 7 Transformers; 7.1 General; 7.2 Utilization and Construction of Transformers; 7.2.1 Utilization of Transformers; 7.2.2 Oil-Immersed Transformers and Dry-Type Transformers; 7.2.3 Characteristic Data of Transformers; 7.3 Operation of Transformers; 7.3.1 Voltage Drop; 7.3.2 Permissible Loading of Transformer Neutral; 7.4 Thermal Permissible Loading; 7.4.1 Temperature Models; 7.4.2 Maximum Permissible Loading of Oil-Immersed Transformers; 7.4.3 Maximal Permissible Loading of Dry-Type Transformers.
|
505 |
8 |
|
|a 7.5 Economical Operation of Transformers7.6 Short-Circuit Strength; 8 Cable Systems; 8.1 General; 8.2 Construction Details; 8.3 Electrical Parameters of Cables; 8.4 Losses and Permissible Current; 8.4.1 General; 8.4.2 Calculation of Losses; 8.4.3 Soil Characteristics; 8.4.4 Thermal Resistances of Cables; 8.4.5 Calculation according to VDE 0276-1000; 8.4.6 Determination of Maximal Permissible Loading by Computer Programs; 8.5 Planning and Design of Cable Routes and Trenches; 8.5.1 Coordination with Other Cables and Pipes; 8.5.2 Effect of Thermally Unfavorable Areas.
|
520 |
1 |
|
|a "Describing in detail how electrical power systems are planned and designed, this book illustrates the required structures of systems, substations and equipment using international standards and latest computer methods. Advantages and disadvantages of the different arrangements within switchyards and of the topologies of the power systems are discussed, describing methods to determine the main design parameters of cables, overhead lines, and transformers needed to realize the supply task, as well as the influence of environmental conditions on the design and the permissible loading of the equipment. Additionally, general requirements for protection schemes and the main schemes related to the various protection tasks are given." "With its focus on the requirements and procedures of tendering and project contracting, this book enables the reader to adapt the basics of power systems and equipment design to special tasks and engineering projects"--Publisher.
|
588 |
0 |
|
|a Print version record.
|
650 |
|
0 |
|a Electric power systems.
|0 http://id.loc.gov/authorities/subjects/sh85041921.
|
650 |
|
0 |
|a Electric power systems
|x Design and construction.
|
650 |
|
7 |
|a Electric power systems.
|2 fast
|0 (OCoLC)fst00905529.
|
650 |
|
7 |
|a Electric power systems
|x Design and construction.
|2 fast
|0 (OCoLC)fst00905547.
|
700 |
1 |
|
|a Rofalski, Karl-Heinz.
|0 http://id.loc.gov/authorities/names/nb2008013890
|1 http://isni.org/isni/0000000115998000.
|
776 |
0 |
8 |
|i Print version:
|a Schlabbach, J. (Jürgen).
|t Power system engineering.
|d Weinheim : Wiley-VCH, ©2008
|z 9783527407590
|z 3527407596
|w (OCoLC)212432092.
|
856 |
4 |
0 |
|u https://colorado.idm.oclc.org/login?url=https://onlinelibrary.wiley.com/doi/book/10.1002/9783527622795
|z Full Text (via Wiley)
|
907 |
|
|
|a .b122083295
|b 06-06-22
|c 05-19-22
|
998 |
|
|
|a web
|b 05-31-22
|c b
|d b
|e -
|f eng
|g gw
|h 0
|i 1
|
907 |
|
|
|a .b122083295
|b 06-01-22
|c 05-19-22
|
944 |
|
|
|a MARS - RDA ENRICHED
|
915 |
|
|
|a I
|
956 |
|
|
|a Wiley Online Library eBooks
|
956 |
|
|
|b Wiley Online Library: Complete oBooks
|
999 |
f |
f |
|i 0dff0356-9564-5841-930f-ca5c7bc6bbb9
|s 06dd8221-5734-5c09-9508-3ace53a9182e
|
952 |
f |
f |
|p Can circulate
|a University of Colorado Boulder
|b Online
|c Online
|d Online
|e TK1001 .S353 2008eb
|h Library of Congress classification
|i web
|n 1
|