Concrete performance in Grand Coulee Forebay Dam, Washington : 10-year core report / by William L. Tison, W. Ray Willingham ; performed by U.S. Army Engineer Laboratory, U.S. Army Corps of Engineers, South Atlantic Division.
Saved in:
Main Author: | |
---|---|
Corporate Authors: | , |
Other Authors: | |
Format: | Government Document Book |
Language: | English |
Published: |
Denver, Colo. :
Concrete and Structural Branch, Division of Research and Laboratory Services, Engineering and Research Center, U.S. Dept. of the Interior, Bureau of Reclamation,
[1985]
|
Series: | GR (Series) ;
85-10. |
Subjects: |
Item Description: | Shipping list number: 86-388-P. "November 1985." |
---|---|
Physical Description: | iii, 115 pages : illustrations ; 28 cm. |
Bibliography: | Includes bibliographical references (page 10). |