|
|
|
|
LEADER |
00000nam a2200000 a 4500 |
001 |
b2850123 |
003 |
CoU |
005 |
19980908082050.0 |
008 |
980908s1998 dcu l f000 0 eng d |
035 |
|
|
|a (OCoLC)ocm39821291
|
035 |
|
|
|a (GPO)97100730
|
037 |
|
|
|a 869-036-00039-1
|b GPO
|
040 |
|
|
|a GPO
|c GPO
|d DLC
|d MvI
|
043 |
|
|
|a n-us-wa
|
049 |
|
|
|a COD9
|
074 |
|
|
|a 0575
|
086 |
0 |
|
|a AE 2.110:105-192
|
086 |
0 |
|
|a AE 2.110:105-192
|
088 |
|
|
|a Public Law 105-192
|
110 |
1 |
|
|a United States.
|0 http://id.loc.gov/authorities/names/n78095330
|1 http://isni.org/isni/0000000123315230.
|
245 |
1 |
3 |
|a An Act to Extend the Deadline under the Federal Power Act for the Construction of the Bear Creek Hydroelectric Project in the State of Washington, and for Other Purposes.
|
260 |
|
|
|a [Washington, D.C.?] :
|b [U.S. G.P.O.] :
|b [Supt. of Docs., U.S. G.P.O., distributor],
|c [1998]
|
300 |
|
|
|a 1 unnumbered leaf ;
|c 24 cm.
|
336 |
|
|
|a text
|b txt
|2 rdacontent.
|
337 |
|
|
|a unmediated
|b n
|2 rdamedia.
|
338 |
|
|
|a sheet
|b nb
|2 rdacarrier.
|
500 |
|
|
|a Caption title.
|
500 |
|
|
|a Distributed to some depository libraries in microfiche.
|
500 |
|
|
|a Shipping list number: 98-0333-P.
|
500 |
|
|
|a "July 14, 1998, (H.R. 1184)."
|
500 |
|
|
|a "112 Stat. 625."
|
500 |
|
|
|a "Public Law 105-192."
|
650 |
|
0 |
|a Hydroelectric power plants
|x Law and legislation
|z Washington (State)
|
650 |
|
0 |
|a Hydroelectric power plants
|x Licenses
|z Washington (State)
|
907 |
|
|
|a .b28501238
|b 03-18-20
|c 10-14-98
|
998 |
|
|
|a gov
|b 10-14-98
|c -
|d m
|e -
|f eng
|g dcu
|h 3
|i 1
|
907 |
|
|
|a .b28501238
|b 11-23-14
|c 10-14-98
|
944 |
|
|
|a MARS - RDA ENRICHED
|
907 |
|
|
|a .b28501238
|b 12-20-08
|c 10-14-98
|
907 |
|
|
|a .b28501238
|b 02-25-02
|c 10-14-98
|
999 |
f |
f |
|i f704dc6f-8303-5184-91a7-cd71a4dda6db
|s 38d2a15f-d05b-53fa-bf11-89f16f89b156
|