|
|
|
|
LEADER |
00000nam a22000003u 4500 |
001 |
b5634149 |
003 |
CoU |
005 |
20091210022705.0 |
006 |
m d f |
007 |
cr un |
008 |
091215e19980501dcu st f0|||||eng|d |
035 |
|
|
|a (TOE)ost656591
|
035 |
|
|
|a (TOE)656591
|
040 |
|
|
|a TOE
|c TOE
|
049 |
|
|
|a GDWR
|
072 |
|
7 |
|a 9
|2 edbsc
|
086 |
0 |
|
|a E 1.99:DOE/GO/10132--T2
|
086 |
0 |
|
|a E 1.99:DOE/GO/10132--T2
|
088 |
|
|
|a DOE/GO/10132--T2
|
088 |
|
|
|a DE98006142
|
245 |
0 |
0 |
|a Biomass power for rural development. Technical progress report, October 1--December 31, 1997
|h [electronic resource]
|
260 |
|
|
|a Washington, DC :
|b United States. Dept. of Energy. Office of Energy Efficiency and Renewable Energy ;
|a Oak Ridge, Tenn. :
|b distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
|c 1998.
|
300 |
|
|
|a 18 p.
|
336 |
|
|
|a text
|b txt
|2 rdacontent.
|
337 |
|
|
|a computer
|b c
|2 rdamedia.
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier.
|
500 |
|
|
|a Published through the Information Bridge: DOE Scientific and Technical Information.
|
500 |
|
|
|a 05/01/1998.
|
500 |
|
|
|a "DOE/GO/10132--T2"
|
500 |
|
|
|a "DE98006142"
|
500 |
|
|
|a Neuhauser, E.
|
500 |
|
|
|a Niagara Mohawk Power Corp., Syracuse, NY (United States)
|
520 |
3 |
|
|a The focus of the DOE/USDA sponsored biomass power for rural development project is to develop commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-2 of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPÙs Seward Station where testing is underway. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED̀s McNeill Power Station. Phase-3 will represent fullscale commercialization of the energy crop and power generation on a sustainable basis. During the fourth quarter of 1997 the Consortium submitted a Phase-2 proposal. A few of the other more important milestones are outlined below. The first quarter of 1998 will be dominated by pre-planting activity in the spring.
|
536 |
|
|
|b FC36-96GO10132.
|
650 |
|
7 |
|a Progress Report.
|2 local.
|
650 |
|
7 |
|a Willows.
|2 local.
|
650 |
|
7 |
|a Biomass Plantations.
|2 local.
|
650 |
|
7 |
|a Cocombustion.
|2 local.
|
650 |
|
7 |
|a Fossil-fuel Power Plants.
|2 local.
|
650 |
|
7 |
|a Energy Source Development.
|2 local.
|
650 |
|
7 |
|a Demonstration Programs.
|2 local.
|
650 |
|
7 |
|a Biomass Fuels ;20 Fossil-fueled Power Plants.
|2 edbsc.
|
710 |
2 |
|
|a United States.
|b Department of Energy.
|b Office of Energy Efficiency and Renewable Energy.
|4 spn.
|
710 |
2 |
|
|a United States.
|b Department of Energy.
|b Golden Field Office.
|4 res.
|
710 |
2 |
|
|a United States.
|b Department of Energy.
|b Office of Scientific and Technical Information.
|4 dst.
|
856 |
4 |
0 |
|u http://www.osti.gov/servlets/purl/656591-MhS5Px/webviewable/
|z Online Access
|
907 |
|
|
|a .b56341490
|b 03-06-23
|c 12-16-09
|
998 |
|
|
|a web
|b 12-16-09
|c f
|d m
|e p
|f eng
|g dcu
|h 0
|i 1
|
956 |
|
|
|a Information bridge
|
999 |
f |
f |
|i 754e1c0e-aa4e-5b7d-934c-5f1ab09a9630
|s d33d7e5d-e055-59f9-a6eb-df9fece76aff
|
952 |
f |
f |
|p Can circulate
|a University of Colorado Boulder
|b Online
|c Online
|d Online
|e E 1.99:DOE/GO/10132--T2
|h Superintendent of Documents classification
|i web
|n 1
|