Electronic refrigerant leak detector. Quarterly technical progress report [electronic resource]

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: United States. Department of Energy. Golden Field Office (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : United States. Dept. of Energy ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1998.
Subjects:

MARC

LEADER 00000nam a22000003u 4500
001 b5635084
003 CoU
005 20091211001125.0
006 m d f
007 cr un
008 091215e19981015dcu st f0|||||eng|d
035 |a (TOE)ost666134 
035 |a (TOE)666134 
040 |a TOE  |c TOE 
049 |a GDWR 
072 7 |a 44  |2 edbsc 
086 0 |a E 1.99:DOE/GO/10301--T1 
086 0 |a E 1.99:DOE/GO/10301--T1 
088 |a DOE/GO/10301--T1 
088 |a DE99000003 
245 0 0 |a Electronic refrigerant leak detector. Quarterly technical progress report  |h [electronic resource] 
260 |a Washington, D.C. :  |b United States. Dept. of Energy ;  |a Oak Ridge, Tenn. :  |b distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,   |c 1998. 
300 |a 5 p. 
336 |a text  |b txt  |2 rdacontent. 
337 |a computer  |b c  |2 rdamedia. 
338 |a online resource  |b cr  |2 rdacarrier. 
500 |a Published through the Information Bridge: DOE Scientific and Technical Information. 
500 |a 10/15/1998. 
500 |a "DOE/GO/10301--T1" 
500 |a "DE99000003" 
500 |a Talamas, E. Jr. 
500 |a Micronic, Inc., Miami, FL (United States) 
520 3 |a The project comprises three main tasks. They are (1) Develop, design, and fabricate sensors, (2) Develop, design, and fabricate test instruments, (3) Testing and data analysis. The milestone includes 17 sub-tasks for the 52-weeks project period, starting on May 1, 1998 and ending on April 30, 1999. As stated in the Application for Federal Assistance, Micronic intended to relocate to a new office by June of 1998. This decision was delayed, since the first partial payment was transferred on August 12, 1998. Micronic plans to relocate this November. A second Provisional Application for a US patent has been filed. Progress made during this period is reported. 
536 |b FG36-98GO10301. 
650 7 |a Progress Report.  |2 local. 
650 7 |a Refrigerating Machinery.  |2 local. 
650 7 |a Refrigerants.  |2 local. 
650 7 |a Leak Detectors.  |2 local. 
650 7 |a Design.  |2 local. 
650 7 |a Fabrication.  |2 local. 
650 7 |a Performance Testing.  |2 local. 
650 7 |a Instrumentation, Including Nuclear And Particle Detectors;32 Energy Conservation, Consumption, And Utilization.  |2 edbsc. 
710 2 |a United States.  |b Department of Energy.  |4 spn. 
710 2 |a United States.  |b Department of Energy.  |b Golden Field Office.  |4 res. 
710 2 |a United States.  |b Department of Energy.  |b Office of Scientific and Technical Information.  |4 dst. 
856 4 0 |u http://www.osti.gov/servlets/purl/666134-ri5JrG/webviewable/  |z Online Access 
907 |a .b56350843  |b 03-06-23  |c 12-16-09 
998 |a web  |b 12-16-09  |c f  |d m   |e p  |f eng  |g dcu  |h 0  |i 1 
956 |a Information bridge 
999 f f |i 10f67314-fe32-5769-81bd-eba6e35867ca  |s 78ebdee7-5473-556a-a3b6-a283eb3e0452 
952 f f |p Can circulate  |a University of Colorado Boulder  |b Online  |c Online  |d Online  |e E 1.99:DOE/GO/10301--T1  |h Superintendent of Documents classification  |i web  |n 1