Operation and improvements of the Fermilab 400 MeV Linac [electronic resource]

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: Fermi National Accelerator Laboratory (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : United States. Dept. of Energy ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1996.
Subjects:

MARC

LEADER 00000cam a22000003u 4500
001 b5652506
003 CoU
005 20090331220959.0
006 m d f
007 cr un
008 091215e19960901dcu s| f1|||||eng|d
035 |a (TOE)ost385476 
035 |a (TOE)385476 
040 |a TOE  |c TOE 
049 |a GDWR 
072 7 |a 43  |2 edbsc 
086 0 |a E 1.99:CONF-9608123--39 
086 0 |a E 1.99:FNAL/C--96/322 
086 0 |a E 1.99:CONF-9608123--39 
088 |a FNAL/C--96/322 
088 |a CONF-9608123--39 
088 |a DE96050554 
245 0 0 |a Operation and improvements of the Fermilab 400 MeV Linac  |h [electronic resource] 
260 |a Washington, D.C. :  |b United States. Dept. of Energy ;  |a Oak Ridge, Tenn. :  |b distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,   |c 1996. 
300 |a 5 p. 
336 |a text  |b txt  |2 rdacontent. 
337 |a computer  |b c  |2 rdamedia. 
338 |a online resource  |b cr  |2 rdacarrier. 
500 |a Published through the Information Bridge: DOE Scientific and Technical Information. 
500 |a 09/01/1996. 
500 |a "FNAL/C--96/322" 
500 |a "CONF-9608123--39" 
500 |a "DE96050554" 
500 |a 18. international linac conference, Geneva (Switzerland), 26-30 Aug 1996. 
500 |a Schmidt, C.W.; Allen, L.J.; Popovic, M. 
520 3 |a The 400 MeV Fermilab Linac Upgrade commissioning began August 28, 1993. High energy physics collider operation (run 1b) began in November 1993 and ended March 1, 1996. The Linac, operating at 98% reliability, provided 400 MeV H⁻ beam to the Booster and 66 MeV H⁻ beam to the Neutron Therapy Facility. During this time, the beam intensity, which initially was administratively set to 35 MA, rose to a peak of 50 mA while losses decreased significantly. This paper discusses the Linac operation and reliability since the Upgrade. 
536 |b AC02-76CH03000. 
650 7 |a Fermilab Accelerator.  |2 local. 
650 7 |a Linear Accelerators.  |2 local. 
650 7 |a Reliability.  |2 local. 
650 7 |a Performance.  |2 local. 
650 7 |a Hydrogen 1 Minus Beams.  |2 local. 
650 7 |a Mev Range 100-1000.  |2 local. 
650 7 |a Mev Range 10-100.  |2 local. 
650 7 |a Operation.  |2 local. 
650 7 |a Power Losses.  |2 local. 
650 7 |a Beam Monitoring.  |2 local. 
650 7 |a Beam Currents.  |2 local. 
650 7 |a Particle Accelerators.  |2 edbsc. 
710 2 |a Fermi National Accelerator Laboratory.  |4 res. 
710 2 |a United States.  |b Department of Energy.  |4 spn. 
710 2 |a United States.  |b Department of Energy.  |b Office of Scientific and Technical Information.  |4 dst. 
856 4 0 |u http://www.osti.gov/servlets/purl/385476-Eagq4M/webviewable/  |z Online Access 
907 |a .b56525060  |b 03-06-23  |c 12-20-09 
998 |a web  |b 12-20-09  |c f  |d m   |e p  |f eng  |g dcu  |h 0  |i 1 
956 |a Information bridge 
999 f f |i a1478b5c-51a2-52f5-803a-0e53948dd66c  |s 3202d487-9016-5955-b0e2-415d852010a7 
952 f f |p Can circulate  |a University of Colorado Boulder  |b Online  |c Online  |d Online  |e E 1.99:CONF-9608123--39  |h Superintendent of Documents classification  |i web  |n 1