Commissioning School Construction Projects. IssueTrak [electronic resource] : A CEFPI Brief on Educational Facility Issues / Peter Keithly.

This "IssueTrak" discusses an increasing interest in verifying the installation and performance of building systems prior to delivery and final acceptance by the building owner. This interest in quality assurance has spawned a new and distinct professional construction discipline referred...

Full description

Saved in:
Bibliographic Details
Online Access: Full Text (via ERIC)
Main Author: Keithly, Peter
Corporate Author: Council of Educational Facility Planners
Format: Electronic eBook
Language:English
Published: [Place of publication not identified] : Distributed by ERIC Clearinghouse, 2005.
Subjects:

MARC

LEADER 00000nam a22000002u 4500
001 b6090452
003 CoU
005 20080220161414.2
006 m d f
007 cr un
008 050101s2005 xx |||| ot ||| | eng d
035 |a (ERIC)ed488773 
040 |a ericd  |c ericd  |d MvI 
099 |a ED488773 
100 1 |a Keithly, Peter. 
245 1 0 |a Commissioning School Construction Projects. IssueTrak  |h [electronic resource] :  |b A CEFPI Brief on Educational Facility Issues /  |c Peter Keithly. 
260 |a [Place of publication not identified] :  |b Distributed by ERIC Clearinghouse,  |c 2005. 
300 |a 4 pages. 
336 |a text  |b txt  |2 rdacontent. 
337 |a computer  |b c  |2 rdamedia. 
338 |a online resource  |b cr  |2 rdacarrier. 
500 |a Availability: Council of Educational Facility Planners (CEFPI), 9180 E. Desert Cove, Suite 104, Scottsdale, AZ 85260. Tel: 480-391-0840; Fax: 480-391-0940; e-mail: contact@cefpi.org; Web site: http://www.cefpi.org.  |5 ericd. 
500 |a Abstractor: ERIC.  |5 ericd. 
500 |a Educational level discussed: Elementary Secondary Education. 
500 |a Educational level discussed: Kindergarten. 
516 |a Text (Reports, Descriptive) 
520 |a This "IssueTrak" discusses an increasing interest in verifying the installation and performance of building systems prior to delivery and final acceptance by the building owner. This interest in quality assurance has spawned a new and distinct professional construction discipline referred to as building commissioning. The principal objective of commissioning is to define, develop and integrate a formal and fully documented process of review, inspections and testing into the standard project delivery methods. Several states have required a formal commissioning plan be implemented as part of the construction process on all major school district projects, and in some cases, commissioning has become a prerequisite to final project acceptance. The firm and/or individual responsible for developing and managing the commissioning process is referred to as the Commissioning Agent or Commissioning Authority (CA). The scope of services commonly available under the CA's contract can include the following: Pre-Design Phase; Design Phase; Construction Phase; Post-Construction Phase; Warranty Phase. These disciplines have been used in over 200 K-12 projects. 
524 |a Council of Educational Facility Planners International.  |2 ericd. 
650 0 7 |a School Construction.  |2 ericd. 
650 0 7 |a Quality Control.  |2 ericd. 
650 0 7 |a Construction Industry.  |2 ericd. 
650 0 7 |a School Buildings.  |2 ericd. 
650 0 7 |a Educational Facilities Planning.  |2 ericd. 
710 2 |a Council of Educational Facility Planners.  |0 http://id.loc.gov/authorities/names/n78083422  |1 http://isni.org/isni/0000000086431266. 
856 4 0 |u http://files.eric.ed.gov/fulltext/ED488773.pdf  |z Full Text (via ERIC) 
907 |a .b60904525  |b 07-05-22  |c 10-08-10 
998 |a web  |b 10-08-10  |c b  |d m   |e -  |f eng  |g xx   |h 0  |i 1 
907 |a .b60904525  |b 06-10-19  |c 10-08-10 
944 |a MARS - RDA ENRICHED 
956 |a ERIC 
948 |a bslw18/19 : may : ess 
907 |a .b60904525  |b 05-13-19  |c 10-08-10 
999 f f |i 52c6b293-4da2-58b3-ba40-27a1f1b7ad8b  |s e42cf14b-fb1d-5bb7-b4ac-6c4784212178 
952 f f |p Can circulate  |a University of Colorado Boulder  |b Online  |c Online  |d Online  |e ED488773  |h Other scheme  |i web  |n 1