Biogas systems in China [electronic resource] / Bin Chen, Tasawar Hayat, Ahmed Alsaedi.
Saved in:
Online Access: |
Full Text (via Springer) |
---|---|
Main Author: | |
Other Authors: | , |
Format: | Electronic eBook |
Language: | English |
Published: |
Berlin :
Springer,
2017.
|
Subjects: |
Table of Contents:
- Preface; Acknowledgements; Contents; About the Authors; List of Figures; List of Tables; 1 History of Biogas Production in China; Abstract; 1.1 The History of Biogas in China; 1.2 Significance of Developing Biogas in China; 1.3 Policies for Biogas Projects; 1.3.1 Energy Policies for Biogas Projects; 1.3.2 Environmental Policies for Biogas Projects; 1.3.3 Economic Policies for Biogas Projects; 1.3.4 Standards for Biogas Projects; 1.4 Development of Biogas Industrialization; 1.4.1 Introduction of Biogas Production; 1.4.2 Biogas Plant Industry; 1.4.3 Biogas Equipment Industry.
- 1.4.4 Biogas Service Industry1.5 Development Planning for Biogas Production; 1.5.1 Developing Motion of Biogas Production; 1.5.2 Rural Biogas Development Policies; References; 2 Main Methods; Abstract; 2.1 Life-Cycle Assessment (LCA); 2.1.1 Background of LCA; 2.1.2 Methodology of LCA; 2.1.3 LCA-Based Integrated Evaluation Indices; 2.2 Economic Assessment; 2.2.1 Cost-Benefit Analysis; 2.2.2 Data Envelopment Analysis (DEA); 2.3 Emergy Analysis; 2.3.1 Emergy Concept; 2.3.2 Emergy Diagram; 2.3.3 Emergy Indices; 2.3.4 Emergetic Ternary Diagrams; 2.4 Extended Exergy Analysis.
- 2.4.1 Extended Exergy Analysis Framework2.4.2 Extended Exergy-Based Sustainability Indexes; 2.5 Analytic Hierarchy Process; References; 3 Four Typical Biogas Systems in China; Abstract; 3.1 "Six-in-One" Biogas System (SIOBS); 3.1.1 Biogas Plant Construction Stage; 3.1.2 Biogas Plant Maintenance Stage; 3.1.3 Feedstock Supply Stage; 3.1.4 Biogas Energy Utilization Stage; 3.1.5 Digestate Processing Stage; 3.2 Biogas-Persimmon Cultivation and Processing System (BCPS); 3.2.1 Biogas Infrastructure (Fraction I); 3.2.2 Biogas System Operation (Fraction II)
- 3.2.3 Digestate Reuse for Persimmon Cultivation (Fraction III)3.2.4 Biogas Utilization for Persimmon Processing (Fraction IV); 3.3 Wastewater Treatment Plants (WWTPs); 3.3.1 WWTP Construction Stage; 3.3.2 WWTP Operation and Maintenance Stage; 3.3.3 Biogas-Sludge Use Stage; 3.4 "Three-in-One" Biogas Project; References; 4 Environment Emissions of Household Biogas Project; Abstract; 4.1 Biogas-Persimmon Cultivation and Processing System (BCPS); 4.1.1 Emissions Inventory; 4.1.2 GHG Emissions Mitigation; 4.2 Wastewater Treatment Plants (WWTPs); 4.2.1 Emissions Inventory.
- 4.2.2 Environmental Impact Mitigation4.3 'Six in One' Biogas System (SIOBS); 4.3.1 System Inventory; 4.3.2 Overall Environmental Evaluation; 4.3.3 Sensitivity Analysis; 4.3.4 Digestate Reuse; 4.3.5 Environmental Benefit Under Different Scenarios; References; 5 Energy Evaluation of Household Biogas Project; Abstract; 5.1 Life-Cycle Energy Evaluation; 5.2 Case Study of BCPS; 5.3 "Six in One" Biogas System (SIOBS); 5.3.1 Overall Energy Evaluation; 5.3.2 Sensitivity Analysis; 5.3.3 Environmental Benefit Under Different Scenarios; 5.3.4 Digestate Reuse; 5.4 Wastewater Treatment Plants (WWTPs)