Shore between Pemberton Point and Cape Cod Canal, Mass., beach erosion control study : letter from the Secretary of the Army transmitting a letter from the Chief of Engineers, Department of the Army, dated July 30, 1959, submitting a report, together with accompanying papers and illustrations, on a cooperative beach erosion control study of the shore between Pemberton Point and Cape Cod Canal, Mass., prepared under the provisions of section 2 of the River and Harbor Act approved on July 3, 1930, as amended and supplemented.

Saved in:
Bibliographic Details
Corporate Author: United States. Army. Corps of Engineers
Format: Government Document Book
Language:English
Published: Washington, D.C. : U.S. G.P.O., 1959.
Subjects:

PASCAL Offsite

Holdings details from PASCAL Offsite
Call Number: D 103.22:P 36
D 103.22:P 36 Available Place a Hold